1 / 5

Engineering Department Report

Engineering Department Report. March 19, 2014 Board Meeting. Garden Home Reservoir Construction Update. Today’s presentation: Brief project history Reservoir information Construction video Next steps. Project History:

joann
Télécharger la présentation

Engineering Department Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering Department Report March 19, 2014 Board Meeting

  2. Garden Home ReservoirConstruction Update • Today’s presentation: • Brief project history • Reservoir information • Construction video • Next steps

  3. Project History: • Steel water tanks built in 1952 and 1962. These tanks were not designed for seismic events. • District initially planned a seismic retrofit project, but costs would have been comparable to replacement. • Additional storage was needed in Metzger, so a larger replacement tank was designed. • Neighborhood opposition delayed the project, but construction started in summer 2013.

  4. Reservoir information: • 1.75 million gallon pre-stressed • concrete reservoir designed to • current seismic codes. • New water lines and valves • on-site. • Automatic control capabilities to isolate tank. • Ability to distribute tank water to fire apparatus or emergency distribution station. • Landscaping and tank painting as compromise with neighbors.

  5. Garden Home Reservoir

More Related