Aurora’s Prairie Waters Project: A Sustainable Water Supply Solution for Colorado

DESCRIPTION

The Prairie Waters Project (PWP) is an innovative water supply solution developed by Aurora Water that addresses the city's long-term water supply needs while ensuring sustainability. Key components include a 34-mile pipeline, three pumping stations, and a 50 MGD water purification facility, utilizing advanced purification strategies such as Riverbank Filtration (RBF) and Aquifer Recharge & Recovery (ARR). The project aims to improve water quality, reduce reliance on trans-basin diversions, and enhance drought resilience for the community, ensuring a reliable source of clean water for future generations.

1 / 29

Télécharger la présentation

Aurora’s Prairie Waters Project: A Sustainable Water Supply Solution for Colorado

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Aurora’s Prairie Waters Project – A Sustainable and Innovative Water Supply SolutionColorado State UniversitySeptember 17, 2007Mark Pifher/Aurora Water

  2. Presentation Outline • Background and Need • Project Alternatives & Integrated Resource Planning • Selected Alternative • Prairie Water Project Overview • PWP Key Components • Purification Strategies • Cost Estimates

  3. South Platte River Colorado River Arkansas River

  4. A Water Supply Crisis for Aurora 26% of Annual Demands in Storage

  5. Prairie Waters Project Provides Drought Hardening and Meets Long-Term Capacity Needs

  6. Aurora Conducted Comprehensive Integrated Resource Planning • 50 potential projects • Range of individual project yields: • 2,000 to 48,000 acre-feet / year • Basins of Origin: • Colorado River • Arkansas River • South Platte River • Demand Management Included with Water Supply Forecasts

  7. Integrated Resource Plan Considered Key Criteria in Evaluation of Water Supply Options • Capital/Operating Cost • Institutional/Government/Public Issues • Environmental/Permitting Issues • Sustainability • Expandability • Yield • Schedule Risk

  8. Institutional Hurdles A. Federal permits/approvals (e.g., 404, section 7) B. Federal facilities (e.g., Bureau of Reclamation) C. NEPA reviews D. Local permitting (e.g., land use regulations) E. Local politics (e.g., ag to urban transfers, transbasin diversions) F. Public perception G. HB 1177 Roundtable Process

  9. Regulatory Issues A. SDWA Requirements 1. MCLs 2. SWAP 3. Treatment Requirements (WQCD) 4. TDS Levels (Citizens) B. DFlows and Discharge Permits C. “New” Water Quality Standards (includes temperature and emerging contaminants)

  10. Regulatory Issues D. “New” Aquatic Life Tiers E. R/O Brine Disposal F. 404 Permit and 401 certification G. ESA Issues (flows, mice, prairie dogs, eagles) H. South Platte TMDL Efforts

  11. Aurora’s Prairie Waters Project

  12. Aurora’s New Water Supply Project 34 miles of 60-inch pipeline 3 pumping stations North Campus (bank filtration and aquifer recharge and recovery) 50-mgd water purification facility

  13. Water Quality Considerations for Prairie Waters Project (PWP) Supply Pathogens Micro-pollutants Endocrine Disrupting Compounds and Persistent Pharmaceuticals N- nitrosodimethylamine (NDMA) TDS Total Organic Carbon (TOC) Nitrate Phosphorus

  14. Comparison of Quality of Aurora’s Water Supplies

  15. Aurora Water Quality Goals Nitrate < 2 mg/L TDS < 400 mg/L Hardness < 150 mg/L TOC < 4 mg/L DBP concentrations no more than current supply NDMA < 10 ng/L Reduce concentration of micro-pollutants and pharmaceuticals Use a natural purification systems as initial purification step

  16. Dr. Ken Carlson Dr. Gary Amy Dr. Jörg Drewes SPP’s purification systems supported by Colorado’s experts

  17. Softening Challenges Taste and Odor Color TDS Nitrate Pathogens Organics Micro-Pollutants Combining the Best of Natural and Engineered Purification Steps

  18. Riverbank Filtration (RBF) (10 days travel time) Aquifer Recharge & Recovery (ARR)(30 days travel time) Prairie Waters ProjectNatural Purification Systems

  19. Riverbank Filtration (RBF) Field Testing Travel time – approx 10 to 15 days Water quality testing TOC, turbidity, nutrients (e.g., nitrogen, phosphate) Organic micropollutants Pharmaceutical Personal care products and other trace Endocrine Disrupters Emerging contaminants 0 m 100 m

  20. Aquifer Recharge and Recovery Testing • Feedwater from RBF site • 25 Monitoring wells • 3 nested piezometer wells • 4 production wells • Water quality testing: • Bulk parameters (TOC, pH, conductivity, nitrate, ammonia) • Organic micropollutants

  21. RBF and ARR are reliable sustainable/natural purification processes • Nitrate reduced to < 2 mg/L in RBF with 10 days of travel time • Many trace organics and pharmaceuticals are removed (>80%) through RBF and ARR • Phosphorus removal will require amendments to ARR to adsorb phosphorus • Some persistent organics (flame retardants) are not well removed though biodegradation • NDMA removal is significant at travel times > 20 days

  22. Flow 4000 11 TOC S. Platte 10 TOC RBF water PTW1 3500 9 3000 8 7 2500 6 2000 flow (cfs) TOC concentration (mg/L) 5 1500 4 3 1000 2 500 1 0 0 1/1/2005 2/1/2005 3/1/2005 4/1/2005 5/1/2005 6/1/2005 7/1/2005 8/1/2005 9/1/2005 1/1/2006 2/1/2006 3/1/2006 4/1/2006 5/1/2006 10/1/2005 11/1/2005 12/1/2005 RBF Field Monitoring - TOC

  23. 12.00 Platte PTW1 10.00 8.00 -N (mg/L) 6.00 3 NO 4.00 2.00 0.00 2/4/05 3/1/05 1/10/05 1/20/05 2/10/05 2/17/05 3/10/05 3/29/05 4/21/05 5/13/05 5/24/05 6/21/05 7/29/05 8/17/05 8/31/05 9/15/05 1/10/06 2/14/06 7/18/05 10/06/05 10/25/05 Consistent Removal of Nitrate Through Denitrification in RBF

  24. RBF/ARR Combination Removal of Selected Pharmaceuticals

  25. Amendments to ARR to Reduce Phosphorus

  26. Prairie Waters Project Cost Estimates

  27. Why is this the right project for Aurora and Colorado? • Responsible Use of Resources • Reduces the need for trans-basin diversions from Western Slope • Maximizing use of an in-basin renewable resource • Uses water rights already owned by the City of Aurora • River Water Quality Benefits • Minimizes need for a waste discharges such as brine from (RO) • Uses natural treatment systems • Environmental Benefits • Avoids the impacts to wilderness landscapes • Maintains rural open space and river corridor habitat • Protects Public Health • Improves reliability of Aurora’s purification processes • Can address changes in water quality • Exceeds current regulations and meets Aurora’s high standards • Can respond to changes in water quality • Cost Effective and Practical • Reduces cost of purification • Maximizes use of $300 million in water rights already owned by the city

  28. Project Supporters: Environmentalists, Farmers, Businesses, Water Quality Experts

  29. Questions?