An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RDE-LDV working group:Update on project organisation (Agenda point 2) Telephone conference 2 February 2013 DG - Joint Research Centre (JRC) IET - Institute for Energy and Transport

  2. Contents • Plans for vehicle testing – status (2.1) • Data requirements (2.2) • Tools, responsibilities for RDE evaluation method • Revision of RDE work plan

  3. 1 Vehicle testing 9 Test vehicles

  4. 1 Test Labs and Sites • 11 Test sites/laboratories + manufacturers • AVL MTC (Sweden) • AVL (Austria) • Continental (France) • DELPHI (Luxembourg) • IDIADA (Spain) • JRC (European Commission) • UTAC (France) • DELPHI (Luxembourg) • TNO (The Netherlands) • TÜV Hessen (Germany) • TÜV Nord (Germany) • Vehicle manufacturers (ACEA, JAMA)

  5. 1 Vehicle testing - Status • VW Passat 2.0 TDI tested by JRC and VW in 2012 • Shipment in spring 2013 to one additional test site (?) • BMW X328i & BMW X1 to be tested by JRC until April 2013 and by BMW in Munich/Steyr (May 2013) • NB: Initial plan (4 vehicles, 2 sites / vehicle), already at 75% • Other test plans under preparation with the voluntary organisations/companies

  6. 2 Data requirements • Vehicle conformity on NEDC (Lab) • Vehicle CO2 emissions on WLTC, per phase and at 5, 15 and 25 oC (Lab) • Vehicle on-road emissions on 2 test sites, 3 test routes per site (PEMS)

  7. 2 Data requirements • TEST PLAN, overview of test cycles and conditions for Lab and PEMS • REF: Test_schedules_RDE-LDV_V7 • PEMS TEST PROTOCOL includes the parameters required to apply the 3 data evaluation strategies (e.g. Engine torque, speed were added for the TUG method) • REF: JRC Guidance document, to be presented at the next RDE meeting, including the reporting templates

  8. 3 Tools and responsibilities • Presentation of tools in the next RDE meeting? • Management of the three tools by TUG, TNO, JRC

  9. 4 Revision of the RDE work plan • A revision of the work plan will be presented at the next meeting. Will be revised or updated: • Planning of experimental activities • Responsibilities for the development of the RDEevaluation methods • Tools and reference documents

  10. DG - Joint Research Centre (JRC) IES - Institute for Energy and Transport Pierre Bonnel: pierre.bonnel@jrc.ec.europa.eu Martin Weiss: martin.weiss@jrc.ec.europa.eu

  11. 4. AOB JRC assessment of candidate procedures published and uploaded to Circa