LPSC Status .

LPSC Status. Assembly Hall. Removal starts and is in progress. Main infrastructure work will be done in November. (floor and wall painting, services installation). LPSC Status. Strip Modules handling tool. Hydraulic strike ordered and delivered in next few days.

kamana
Télécharger la présentation

LPSC Status .

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LPSC Status. • Assembly Hall. • Removal starts and is in progress. • Main infrastructure work will be done in November. • (floor and wall painting, services installation).

  2. LPSC Status. • Strip Modules handling tool. • Hydraulic strike ordered and delivered in next few days. • Structure scheduled for July in our mechanical workshop. • We do a dummy strip module (real size and weight) in order to test • this tool and the SM assembly procedure.

  3. LPSC Status. • SM Platform. • Detailed drawings are in progress. • Scheduled in our mechanical workshop for December

  4. LPSC Status. • SM tilt over mechanism. (needed in vertical Cosmic tests design) • Basic design is in progress. Winch Cable Tilt platform

  5. LPSC Status. • SM tilt over mechanism. (needed in vertical Cosmic tests design) • Conceptual design is in progress.

  6. LPSC Status. • Test beam Scintillators paddles: - Done and tested.