100 likes | 311 Vues
Trondheim. MARINTEK Norwegian Marine Technology Research Institute. Presentation at EU Information day Oslo 20 January 2004 Egil Rensvik, MARINTEK. SINTEF’s organization. SINTEF Group SINTEF Applied Mathematics SINTEF Civil and Environmental Engineering
E N D
Trondheim MARINTEK Norwegian Marine Technology Research Institute Presentation at EU Information day Oslo 20 January 2004 Egil Rensvik, MARINTEK
SINTEF’s organization SINTEF Group SINTEF AppliedMathematics SINTEF Civil and Environmental Engineering SINTEF Electronics and Cybernetics SINTEF Applied Chemistry SINTEF Materials Technology SINTEF Industrial Management SINTEF Telecom and Informatics SINTEF Unimed SINTEF Energy Research SINTEF Petroleum Research MARINTEK Maritime Research SINTEF Fisheries & Aquaculture
MARINTEK projects in EC - 4 FWP SAFETY-NET - Competence development and flexible learning POSEIDON - VTS - Vessel Traffic Services SAFECO I / II - Safety in coastal waters IPSI - Waterborne logistics solutions STEMM - Transport policy study ERGO - Strategy. Energy efficient routing ICE ROUTES - Ships routing in arctic areas TASSOP - Safety induction and training of offshore personnel DISC I / II - Demonstration of Integrated Ship Control Systems INFOLOG - Intermodal Information Link for Improved Logistics MOSYS - Development of maintenance cost analysis models CASMET - Casualty analysis methodology for maritime operations SAFE PASSAGE - Web-based safety training for seafarers STCW On Course - Multimedia training material development MarPower/TNET - Concepts of advanced marine machinery systems DISCOVER - Developing virtual environment team training simulations CARGO-OPS - Web-based training for port personnel COMARPROP - Composite marine propellers Involved in: Interport - Cargo information / tracing / tracking Euroborder - Organizational issues in ports
MARINTEK projects in EC - 5 FWP STID - Steam injection diesel engine Waterman-Ts - Waterborne traffic and transport management - Thematic network THEMIS (TN) - Thematic network in optimizing the management of intermodal transport services THEMES (TN) - Thematic network on safety assessment in waterborne transport IP - Intermodal Portal - Integration of ports into intermodal transport chains TRESHIP (TN) - Technologies for reduced environmental impact from ships MARPOWER (TN) - Concepts of advanced marine machinery systems with low pollution and high efficiency FLOWMART - Efficient low wash maritime transportation SWAN - Standardization and dissimination support actions for waterborne telematics networks and applications ITEA-DS - Intelligent tools for Emergency applications and decision support D2D - Demonstration of an integrated management and communication system for Door 2 Door intermodal freight transport operations MARTOB - On board treatment of ballast water and application of low sulphur marine fuel HullMon+ - Intelligent hull monitoring systems
Experience from MARINTEK EU FP 5 - Programmes • RTD project Hullmon+ (DG RTD) • MARINTEK coordinator • Gives control of the project • Select the right partners
Experience from MARINTEK EU FP 5 - Programmes • RTD project SWAN ( DG IST) • Dissemination of results from other IST projects • RTD project D2D (DG Tren) • WWL coordinator • RTD and demonstration • Practical testing of Norwegian IT systems for Transport Chains
Experience from MARINTEK EU FP 5 - Programmes • Thematic Network THEMES • Important for building consortium for the next project
Experience from MARINTEK EU FP 6 • IP Proposal C4Freight (Transport Corridor-DG Tren) • Large consortium ~ 80 partners • Industrial partners all Europe • MARINTEK(RTD institute) as coordinator – Industry ? • Complicated to make a detailed implementation plan • Did not pass the evaluation
Experience from MARINTEK EU FP 6 • STREP DSS_DC (DG RTD) • MARINTEK coordinator • Smaller consortium – 8 partners • Well defined RTD scope • Positive and close contact with DG RTD in preparation phase. • “Simple” contract negotiations with the Commission • Project started
Experience from MARINTEK • Positive experience • Takes time and resources • Can not win all projects • Select the task which fits your organization and needs • Select partners for a winning team