Power Converter Interlock

Power Converter Interlock. K. Fuchsberger. Purpose: Software interlock system to monitor power converter currents and dump the beam if they exceed certain limits to protect against operation- and feedback- failures. Status: Server and GUI application in place.

katen
Télécharger la présentation

Power Converter Interlock

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Converter Interlock K. Fuchsberger Purpose: Software interlock system to monitor power converter currents and dump the beam if they exceed certain limits to protect against operation- and feedback- failures. • Status: • Server and GUI application in place. • Tracking of LHC status (beam process, time within beamprocess) works. • Acquisition & Decision-taking works. • Configuration-management (storing tolerances in LSA + reusing GUI from YASP): in preparation. • Currently Commissioning and Testing. • Next steps: • More logging to establish reasonable tolerances. • Fix some threading- and memory issues in Server.

  2. Accelerator Testing Framework M. Galetzka, K. Fuchsberger Purpose: Framework to execute and track tests for accelerator systems during commissioning phases. • Status: • Overall design established. • Prototypes of Server and GUI in place. • Display of systems and tests works (replacement for HWC GUI). • Test plan can be displayed as graph • Goal: Have a version with minimum required features for next commissioning campaign (after Christmas). • Ongoing: • Integration with HWC sequencer to execute tests. • Extend GUI to allow better filtering of tests and display more detailed information.

  3. Collaboration with BE-OP K. Fuchsberger • Maintenance of Reference Orbit Management System for the LHC Orbit Feedback (GUI + Sequencer Tasks). • Improving the automated Test Suite for the LHC Orbit Feedback System. • Consulting and Coordinating Developments in the LHC online modeling chain related to JMad (Java API for MadX).