This document provides an update on the infrastructure project, detailing the design and implementation phases scheduled from March to August 2006. The conceptual and final design drafts are due in April, while preparatory projects, including reconfiguration of K12/HAN/Library and replacement of HECN routers, will take place from April to May. The implementation phase is set for June to August, with careful planning to meet the deadline. Key risks include weather and timeline compression. Further information will be shared during the April IVN session.

Télécharger la présentation

Infrastructure Project Update: Design and Implementation Phases Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SIS 2006 Update March 22, 2006

  2. Big Picture • Design Phase – April 13 • Conceptual Design, Final Design Draft • Design Phase – May 30 • Configuration Documentation & Testing • Preparatory Projects Phase – April 17 – May 30 • Reconfigure K12/HAN/Library, Replace current HECN routers, Video testing, local projets • Implementation – June 12 – August 18 • Details to be determined

  3. Design • Conceptual Design is due March 24 • Physical Designs due April 13 • Start equipment orders following week • Includes order lag time and setup time • Document Configuration • Perform Testing

  4. Preparatory Projects Phase • Things we can do before the actual implementation • Planning the details now – Draft Due April 13

  5. Implementation Phase • Can’t be determined until many of the design tasks completed • Planning for it will occur through the month of May • Intend to have at least K12 & HE completed by August deadline

  6. Current Risks • Weather in the Red River Valley • Several fiber runs to be completed • Compressed timeline may impact “burn-in” time • New Technology

  7. More Information • Next IVN Session = April 26 • www.stagenet.nd.gov/projects/infrastructure/index.html • Biweekly status reports • Project Plans • RFPs • Lots More