GLAST LAT System Engineering
50 likes | 185 Vues
This document outlines the agenda for the upcoming planning meeting regarding the Large Area Telescope (LAT) of the Gamma-ray Large Area Space Telescope (GLAST) project. Key topics include the established LAT Level Test Sequence, redundancy configurations, and post-shipment testing procedures. Detailed discussions will cover the installation of radiators, modal surveys, EMI/EMC testing, and comprehensive performance evaluations. This meeting is crucial for ensuring all interfaces are verified and for preparing the LAT for future testing phases at various facilities.
GLAST LAT System Engineering
E N D
Presentation Transcript
Gamma-ray Large Area Space Telescope GLAST LAT System Engineering LAT Test Planning Meeting Rich Baun SLAC rbaun@slac.stanford.edu (650) 926-3520
Agenda • LAT Level Test Sequence • Redundancy Configurations
LAT Level Proposed Test Sequence Install Radiators Baseline Ship to NRL Post-Ship Modal Survey Sine Vibe Post-Rad Install EMI/EMC Acoustic L L L C M C L L E L C R Pre Pre Post Pre Post Axis Pre-Ship Pre-TV T-Bal T-Cycle Final Remove Radiators Pack LAT Ship to GD Weight, CG A C M C C C M L TV Chamber Aliveness Limited Performance Comprehensive Performance EMI/EMC Emissions/Susceptibility Muon Survey Post Radiator Installation Test A L C E M R