1 / 10

CAWG Wind Survey

CAWG Wind Survey. March 28, 2011 Dallas, TX ESWG. Agenda Item 3:. CAWG survey Results & Review. CAWG Wind Survey Overview. Survey focus: Business as Usual future Feb 28: SPP had received all initial responses March 2: Sent out first draft of survey CAWG ESWG

khoi
Télécharger la présentation

CAWG Wind Survey

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CAWG Wind Survey March 28, 2011 Dallas, TX ESWG

  2. Agenda Item 3: CAWG survey Results & Review

  3. CAWG Wind Survey Overview • Survey focus: Business as Usual future • Feb 28: SPP had received all initial responses • March 2: Sent out first draft of survey • CAWG • ESWG • March 10: CAWG conference call • March 11 - 17: Siting plan developed from survey • March 28: ESWG endorsement requested

  4. CAWG Survey – Wind Generation

  5. CAWG Survey – Renewable Energy

  6. Wind Siting Plan • Future 1: Business as Usual • Targets provided in wind survey • 9,965 MW wind • 14.4% renewable req. • Future 2: EPA Rules with Additional Wind • 20% RES requirement • 13,784 MW wind

  7. Wind Siting Allocation • ITP10 siting utilizes similar approach as ITP20 siting plan • Additional wind to meet targets distributed to NE, KS, OK, and TX sites • Capacity factors pulled from 2005 NREL dataset • Based on 100 meter hub heights

  8. Wind Siting Plans

More Related