1 / 5

Marina Reservoir Recirculation Scheme (MRRS)

Marina Reservoir Recirculation Scheme (MRRS). Purpose of this scheme Create flowing water in the major canals/rivers upstream of Marina Reservoir viz. Alexandra Canal, Bukit Timah Diversion Canal, Whampoa Canal, Rochor Canal, Kallang River, Pelton Canal and Geylang River

kiana
Télécharger la présentation

Marina Reservoir Recirculation Scheme (MRRS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Marina Reservoir Recirculation Scheme (MRRS) Purpose of this scheme • Create flowing water in the major canals/rivers upstream of Marina Reservoir viz. Alexandra Canal, Bukit Timah Diversion Canal, Whampoa Canal, Rochor Canal, Kallang River, Pelton Canal and Geylang River • Improve the quality of water in the tributaries and in Marina Reservoir

  2. Marina Reservoir Recirculation Scheme (MRRS) • Project Status • Consultants: CDM • Detailed design and preparation of tenders in progress • Scope of construction works • Discharge structures • Pipelines • Intake Structure • Modification of existing Waterworks

  3. Marina Reservoir Recirculation Scheme (MRRS) Tenders Schedule • Construction of discharge structures near canals and rivers - called in Jul 08 and awarded in Sep 08 • Supply and delivery of 2200mm dia. pipes & fittings- called in Aug 08, closed in Sep 08 and evaluation in progress • Construction of Intake Structure at Upper Peirce Reservoir - to be called in Oct 2008 4. Modification of Chestnut Avenue Waterworks - to be called in Nov 2008

  4. Construction of Spillway and Channels at Upper Peirce Reservoir

  5. Modification of Chestnut Avenue Waterworks

More Related