Download
marina reservoir recirculation scheme mrrs n.
Skip this Video
Loading SlideShow in 5 Seconds..
Marina Reservoir Recirculation Scheme (MRRS) PowerPoint Presentation
Download Presentation
Marina Reservoir Recirculation Scheme (MRRS)

Marina Reservoir Recirculation Scheme (MRRS)

213 Vues Download Presentation
Télécharger la présentation

Marina Reservoir Recirculation Scheme (MRRS)

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. Marina Reservoir Recirculation Scheme (MRRS) • Project Status • Consultants: CDM • Detailed Design stage • Scope of construction works • Discharge structures & Pipelines • Pumping station and pipelines • Modifications of Existing Waterworks • Spillway and channels

  2. Chestnut Avenue Waterworks Lower Seletar Reservoir Lower Peirce Upper Peirce MacRitchie Kallang River 2nd Bukit Timah Diversion Canal Pelton Canal Whampoa Canal Raw Water Pipeline Upper Thomson Canal Geylang River Rocher Canal Marina Raw Water Pumping Station Stamford Canal Alexandra Canal Singapore River Marina

  3. Marina Reservoir Recirculation Scheme (MRRS) • Tender Schedule • Construction of Discharge Structure for Eastern and Central Pipeline Areas: Geylang River, Pelton Canal, Lower Pierce Reservoir to Kallang River, Rocher Canal, MacRitchie Reservoir to Upper Thomson Canal Expected Tender Calling Date : July 2008 2. Construction of Pumping Station and Pipelines near Whampoa Canal Expected Tender Calling Date : Aug 2008

  4. Marina Reservoir Recirculation Scheme (MRRS) • Tender Schedule 3. Construction of Spillway and Channels from Upper Pierce Reservoir to MacRitchie Reservoir Expected Tender Calling Date : Sep 2008 4. Modification of Chestnut Avenue Waterworks Expected Tender Calling Date : Oct 2008