1 / 18

Operator Reports for New Technologies

Department of Environmental Conservation Drinking Water Program. Operator Reports for New Technologies. Vanessa Wike, P.E. Statewide Engineering Coordinator (907) 269-7696 555 Cordova St. Anchorage, AK 99501 vanessa.wike@alaska.gov. Overview.

kim-park
Télécharger la présentation

Operator Reports for New Technologies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Department of Environmental Conservation Drinking Water Program Operator Reports for New Technologies Vanessa Wike, P.E. Statewide Engineering Coordinator (907) 269-7696 555 Cordova St. Anchorage, AK 99501 vanessa.wike@alaska.gov

  2. Overview • New rules are placing a greater emphasis on the QA/QC of the treatment processes: • A strong focus is being placed on whether the plant is operating within the approved design/construction specifications. • Biggest change will be for UV systems: • Additional training requirements will be included in operational approvals. • Manufacturer Training (bulb change-out, etc). • Consultant Training (dosage calculations, operator reports). • MOR’s: • “Set Point” MOR’s. • “Calculated Dose” MOR’s.

  3. MOR’s • MOR’s for newer Surface Water Treatment technologies will be custom made for each system. • The format of the MOR will depend on parameters set during the design of the system. • Instead of monitoring to identify when things go wrong, monitoring will now be more important in identifying when things are starting to go wrong. Going > Going > Going > Gone

  4. Example “Daily” Report Monthly Operator Report, for “Set Point” Designed UV Treatment Plant

  5. Example “Daily” Report Monthly Operator Report, for “Set Point” Designed UV Treatment Plant

  6. Example “Daily” Report Monthly Operator Report, for “Set Point” Designed UV Treatment Plant Intensity (Dosage) is set during engineering plan review, for specific flow rate. Every 4 hours: ** Time ** Intensity ** Flow

  7. Example “Daily” Report Monthly Operator Report, for “Set Point” Designed UV Treatment Plant Intensity

  8. Example “Daily” Report Monthly Operator Report, for “Set Point” Designed UV Treatment Plant Every MONTH do sensor calibration check. Must Report amount of “Off-Spec” water. * Chapter 6 EPA UV Guidance Manual, 2006.

  9. Example “Daily” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant* * Chapter 6 EPA UV Guidance Manual, 2006.

  10. Example “Daily” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant* * Chapter 6 EPA UV Guidance Manual, 2006.

  11. Example “Daily” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant* • A required dose is set during engineering plan review. • A “Validated Dose” is then calculated, by dividing the calculated dose by a verification factor and a correction factor. This is done for every recorded dose on the MOR. • The “Calculated Dose” approach does not have a single compliance point, but instead has an approved envelope of operational parameters (flow, dose, transmittance). * Chapter 6 EPA UV Guidance Manual, 2006.

  12. Example “Daily” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant* * Chapter 6 EPA UV Guidance Manual, 2006.

  13. Example “Daily” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant* • Each UV Reactor will have a separate MOR. • “Off-Spec” production must be indicated on each report. • Separate forms are required for calibration/verification of the sensor, UVT analyzer and flow meter * Chapter 6 EPA UV Guidance Manual, 2006.

  14. Example “Off-Spec” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant* * Chapter 6 EPA UV Guidance Manual, 2006.

  15. Example “Off-Spec” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant* * Chapter 6 EPA UV Guidance Manual, 2006.

  16. Example “Off-Spec” Report Monthly Operator Report, for “Calculated Dose” Designed UV Treatment Plant* • “Off-Spec” operations must be reported (number of events and volume of water produced). • “Off-Spec” can occur because: • Sensor is not in calibration, or is outside approved limits. • Analyzer is not in calibration, or is outside approved limits. • Flow meter is not in calibration, or is outside approved limits. • To meet LT2, 95% of the water must be treated to validated limits. * Chapter 6 EPA UV Guidance Manual, 2006.

  17. Keys to Succeeding with New Technologies • Monitoring: Residual > Process Control Limits Accurate, Consistent Readings • Be Wary of Complacency Don’t let the instruments think for you! • Treat your instruments with respect: Calibrate, Verify, Maintain If you have questions, please give us a call.

  18. Department of Environmental Conservation Drinking Water Program Operator Reports for New Technologies Vanessa Wike, P.E. Statewide Engineering Coordinator (907) 269-7696 555 Cordova St. Anchorage, AK 99501 vanessa.wike@alaska.gov