1 / 17

U. S. G E N E R A L S E R V I C E S A D M I N I S T R A T I O N

A R R A P R E S E N T A T I O N May 8, 2 0 0 9. U. S. G E N E R A L S E R V I C E S A D M I N I S T R A T I O N. G S A ’ S P U B L I C B U I L D I N G S S E R V I C E Portfolio of 354 M rentable square feet Space for over 1,000,000 tenants 8,603 owned and leased assets

kiora
Télécharger la présentation

U. S. G E N E R A L S E R V I C E S A D M I N I S T R A T I O N

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A R R A P R E S E N T A T I O N May 8, 2 0 0 9 U. S. G E N E R A L S E R V I C E S A D M I N I S T R A T I O N

  2. G S A ’ S P U B L I C B U I L D I N G S S E R V I C E • Portfolio of 354 M rentable square feet • Space for over 1,000,000 tenants • 8,603 owned and leased assets • 30 LEED certified properties • FY ’08 revenue—$8.23 B • $881.2 M in project starts in FY ‘08

  3. P B S R E G I O N A L O R G A N I Z A T I O N S AK New England Region 1 Rocky Mountain Region 8 Northwest/Arctic Region 10 Great Lakes Region 5 ME Northeast & Caribbean Region 2 WA ND VT MT MI NH WI MA SD OR Heartland Region 6 CT RI ID MI NY WY NE IA PR IN IL OH PA Pacific Rim Region 9 NV UT CO NJ VI MD KS MO WV DE Mid-Atlantic Region 3 CA KY VA DC OK AR NC National Capital Region 11 TN AZ NM HI SC MS AL TX LA GA Southeast Region 4 GU Greater Southwest Region 7 FL

  4. P U R P O S E S : T H E A M E R I C A N R E C O V E R Y & R E I N V E S T M E N T A C T OF 2 0 0 9 Creating and saving jobs Increasing domestic renewable energy capacity Investing in infrastructure with long-term economic benefits Stabilizing state and local government budgets Assisting those most impacted by the recession

  5. T H E P B S R E C O V E R Y P A C K A G E • Projects funded in four categories • New Construction • Full and partial building modernizations • Limited scope projects • Small projects

  6. T H E P B S R E C O V E R Y P A C K A G E

  7. G R E E N B U I L D I N G M O D E R N I Z A T I O N S Three Components Totaling $4.3 Billion • Full and partial building modernizations--$3.2 B • Limited scope projects--$807 M • Renewable energy—photovoltaics and wind • Roofing, including green roofs • Windows • Lighting replacement • High-performance building systems • Advanced metering • Small projects--$299 M

  8. N E W C O N S T R U C T I O N A N D O T H E R $750 M Federal Courthouses and Federal Buildings and Modernizations ($450 M for DHS Headquarters) $300 M Land Ports of Entry (Border Stations) $1.0 B + Potential Other Agency Work $1 B 2009 Omnibus Bill

  9. H O W P R O J E C T S H A V E B E E N S E L E C T E D • Energy savings and speed of delivery • Projects that have been designed or are in design with a focus on energy • Projects that can be developed and awarded quickly, getting people back to work • Projects that can be completed before 2015

  10. S P E E D C O U N T S • Take advantage of full funding • Compress our processes • Eliminate wasteful/unnecessary steps • Carefully track all deliverables • Standardize advertisements and contract requirements to align with industry standards

  11. T W O E X A M P L E S: “S H O V E L R E A D Y” P R O J E C T S Broad Range of Opportunities and Challenges • 1975 Federal Building • Never Upgraded • Cutting Edge ‘Green’ Design • $133 M from Recovery Act • Full Building Modernization • High Aims for Sustainability & Curb Appeal • Project is Ready to Build Portland OR

  12. T W O E X A M P L E S: “S H O V E L R E A D Y” P R O J E C T S Broad Range of Opportunities and Challenges • Historic 1917 Building • Last Upgraded in 1935 • Modernization with Infill • $161 M from Recovery Act, as • Phase I • Must Redesign for Energy Goals • Future Funding Needed for Phase II Washington DC

  13. C O N T R A C T I N G • All provisions of the procurement process remain in place • for Recovery Act contracts • Existing security requirements are also applicable • to Recovery Act contracts • Contracting options include: • Full and open competition • MAS schedules • Indefinite Delivery, Indefinite Quantity (IDIQ) contracts • New or existing Blanket Purchase Agreements (BPAs) • Small business set asides

  14. A C O M M I T M E N T T O S M A L L B U S I N E S S E S • Recovery Act mandates the maximum number of practicable small business opportunities • In FY ’08, PBS made $1.2 B of awards to small businesses • For projects awarded to large businesses, a substantial portion of the work went to small business subcontractors • To take advantage of Recovery Act opportunities, small businesses not already part of the GSA contracting system should partner with firms that are

  15. A R E Y O U R E A D Y ? • Register with these websites: • Dun and Bradstreet (D&B)—www.fedgov.dnb.com • Central Contractor Registry (CCR)—www.ccr.gov • Online Representations and Certifications Application (ORCA)—www.bpn.gov • Federal Business Opportunities (FBO)—www.fedbizopps.gov

  16. H O W T O F I N D T H E W O R K GSA advertise all our contracting opportunities on www.FedBizOpps.gov Information re GSA’s Recovery Act activities can be found on www.gsa.gov/recovery The government’s Recovery Act related work is tracked on www.recovery.gov

  17. QUESTIONS?

More Related