An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lessons Learned from a Basic Vulnerability Assessment and Emergency Response Plan Update Project in Greensboro NC AWWA / WEA Annual Conference, Raleigh, November 16, 2015 Steve Drew, Director, Greensboro Water Resources Department Jack Moyer, Carolinas / Tennessee Water Security and Preparedness Area Market Sector Leader, AECOM

  2. Overview • Overview of the Greensboro Water and Reclaimed Water Systems • Historical Perspective – Other Plans in Place • Original VA • Water Supply Division Emergency Operations Manual • Project Methodology • Lessons Learned • Over-arching • VA • ERP

  3. Greensboro Systems Overview • 2 Water treatment plants – 30 and 24 mgd • 3 Raw water lakes and 2 raw water pump stations • 1 Pumped open raw water reservoir • Multiple finished water interconnections

  4. System Overview - Continued • 2 Water reclamation plants - 40 and 16 mgd • 20 Booster pump stations,1 remote finished water reservoir, and 11 elevated storage tanks • 48 Wastewater lift stations • 1,650 and 1,590 miles of water and wastewater mains • Stormwater program • About 370 employees

  5. Historical Perspective– Other Plans in Place • Original Vulnerability Assessment (VA) • As required by Bioterrorism Act of 2002, not updated • Water Supply Division Emergency Operations Manual • As required by Bioterrorism Act of 2002, updated regularly, but Water Supply only • Others • Pandemic Plan • Divisional COOP Plans • Dam EAPs

  6. Project Focus • Update the VA and ERP • Incorporate other divisions of the department • Focus on employee safety • Include an all-hazards perspective

  7. Project Methodology - 1 • Reviewed existing plans • Conducted detailed site assessment visits to all majorfacilities and sampling of remote facilities • Identified critical assets and credible threats • Assessed existing and potential mitigation measures

  8. Project Methodology - 2 • Conducted periodic stakeholder workshops • Prepared VA Report, ERP, including 16 hazard-specific plans, and Fast-action Binders for each major hazard • Conducted training for all employees and tabletop exercise for middle and upper management • WRD developing work station posters

  9. Credible Threats - 1 • Weather events including flooding, large rain events resulting in high wastewater flows, high winds, lightning, ice storms, and tornados • Major equipment or operational failure • Power outages • On-site chemical spills • Nearby HAZMAT releases • Fire

  10. Credible Threats - 2 • Casual, accidental, and recreational trespassers, vandals, and criminals (theft) • Disgruntled persons, up to and including armed intruders/ active shooters • Raw water contamination • Finished water contamination • SCADA system failure • Influent contamination • Personnel illness

  11. Lessons Learned • Over-arching • VA • ERP

  12. Over-arching Lessons • No current regulatory requirements • Water preparedness projects have recently been undertaken only by select, progressive utilities • Visible commitment of upper management is critically important • Understanding larger organizational plans, such as a city when the utility is a city department, is needed • Engagement of internalstakeholders is imperative

  13. VA Lessons - 1 • Focus has shifted much more to all-hazards • Prevailing methodology has evolved from RAM-W to J100 RAMCAP – Risk Analysis and Management for Critical Asset Protection Standard for Risk and Resilience Management of Water and Wastewater Systems • Opportunities for varying levels of J100 assessment and analysis

  14. VA Lessons - 2 • There are always opportunities to address “low-hanging fruit” in security improvements • It is continually challenging to maintain security systems, from fences to cameras

  15. Provide Active Shooter Training • Attacks in the workplace and elsewhere are increasing (FBI) • Most incidents last only 10 – 15 minutes • Training and personal preparation is key • Run, Hide, Fight • Have a personal plan • Help identify at-risk employees – Hear something / Say something

  16. Address Cyber Security • Rapidly evolving threats • Stuxnet / Heartbleed • Presidential Executive Order February 2013 • AWWA Process Control (Cyber) System Security Guidance Document • http://www.awwa.org/portals/0/files/legreg/documents/awwacybersecurityguide.pdf

  17. ERP Lessons • It is always challenging to keep plans up to date, particularly contact information – should be structured to optimize updates • Use annexes and appendices • There is a real need for succession plans for key positions - many utility managers avoid them • Ensure that employees are empowered to call 911 • Need for emergency procurement and contracting provisions

  18. NIMS and ICS– Need Designees and Backups

  19. Engage with Other Agencies

  20. Address Power Failures • Greatest water sector interdependency • Generators, maintenance, and provisions for fueling

  21. Help Employees and Their Families Prepare • Promote a culture of preparedness and security • Establish special work shifts / avoid excessively long work periods • Provide training, specialized equipment, and PPE for their potential roles following disasters • Develop guidance for the preparation of their families • Discourage heroes

  22. Develop Crisis Communications Plans • Designate an organization spokesperson and Public Information Officer (PIO) • Establish a Joint Information Center (JIC) • Prepare critical media messages in advance • Utilize message mapping • Increase use of social media

  23. Join WARN – NC Water WARN • Water / Wastewater Agency Response Networks • Standardized mutual aid agreements • Mutual aid procedures, guidance and established lines of communications • NC Water WARN has a seat in the North Carolina Emergency Operations Center • Sample Operational Plan • Resource Typing Manual

  24. Conduct Training and Exercises • Meet representatives of other units and organizations • Refine plans and procedures • Clarify roles, responsibilities, and lines of communications • Learn available resources, shortcomings, and opportunities for improvement

  25. Questions? Steve Drew - steve.drew@greensboro-nc.gov (336) 373-7893 Jack Moyer - jack.moyer@aecom.com (919) 461-1472