1 / 15

Engine Nacelle Halon Replacement, FAA, WJ Hughes Technical Center

International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002. Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA.

kristy
Télécharger la présentation

Engine Nacelle Halon Replacement, FAA, WJ Hughes Technical Center

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA Engine Nacelle Halon Replacement,FAA, WJ Hughes Technical Center Point of Contact : Doug Ingerson Department of Transportation Federal Aviation Administration WJ Hughes Technical Center Fire Safety Section, AAR-422 Bldg 205 Atlantic City Int'l Airport, NJ 08405 USA tel: 609-485-4945 fax: 609-485-7074 email: Douglas.A.Ingerson@tc.faa.gov web page: http://www.fire.tc.faa.gov/

  2. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA Three Major Topics for Review : progress/current status presentation of recent data near term plans

  3. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA • PROGRESS/CURRENT STATUS • Test Fixture • Fuel System • Prior system to heat the fuel and deliver it to the nozzles in the spray fire zone deemed inadequate • Replaced pump for fuel heating; heating time changes from 1+ hours to 20 minutes • Replace pump for spray nozzles w/pressurized ullage system • Fuel nozzles will be changed to alter flow rate to the spray fire zone • Fire Extinguisher • Equilibrium system in place • Agent/N2 solubility is a notable phenomena • Firex servicing procedures now account for agent/N2 behavior • Distribution plumbing altered to decrease discharge duration

  4. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA • PROGRESS/CURRENT STATUS • Test Fixture (cont’d) • Hot plates • Spray hot plate failed 15Oct01 • Process control thermocouples separate from plate; significant overheat results • Difficulties repaired; operational 7Nov01 • Electrical circuit for the pool hot plate faulted 31Jan02 • Plate removed, reason for fault found and corrected • Operational 5Feb02

  5. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA • PRESENTATION OF RECENT DATA • Data Presentation • Fire Extinguishing System • Problems w/past distribution results required system evaluation • Evaluation produced the following areas likely causing the difficulty • Distribution plumbing • Agent/N2 equilibrium • The resultant changes in the system yielded positive gains in performance • Increased the the cross sectional area of the discharge pathway for the agent flow • The single flow split in the discharge pathway changed from a tee to a wye • Agent/N2 equilibrium behavior calculated (NIST computer program PROFISSY) • Agent/N2 equilibrium attained prior to test discharge

  6. 8” C/L-C/L 8” C/L-C/L International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA PRESENTATION OF RECENT DATA From firex ball valve From firex ball valve 1.25”OD TEE AS FLOW SPLIT 1.25”OD WYE AS FLOW SPLIT • 1/2” TUBE BUTT FOR NOZZLES 1/2”OD tube 5/8”OD tube • 5/8” TUBE BUTT FOR NOZZLES • NOZZLES FARTHEST FROM CORE RESTRICTED BY 5/8”ODx3/8”ID WASHER Within Test Fixture Interior

  7. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA PRESENTATION OF RECENT DATA “Top-off” is the total pressure of the agent/N2 mixture when the system is in equilibrium for the given temperature.

  8. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA PRESENTATION OF RECENT DATA

  9. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA • PRESENTATION OF RECENT DATA • Data Presentation (cont’d) • Gas Analysis • Analyzer completed; known as “Hal2 Rebuilt” • Producing data from transducers as a Direct Current Voltage (VDC) history • Sensor signal starts at a maximum value; as gas concentration increases, signal decreases (converse behavior applies) • Data manipulation • Raw signal run through a smoothing routine • Smoothed data aligned at some consistent signal value • All 12 channels reviewed as one distribution profile • Second review of data incorporates the minimum and maximum values for each time increment

  10. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA PRESENTATION OF RECENT DATA

  11. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA PRESENTATION OF RECENT DATA as of 25Feb02... Ring location ch# - clock position FWD MID AFT 11-12:00 05-1:00 10-12:00 09-3:00 03-4:30 12-3:00 04-6:00 01-7:30 02-6:00 08-9:00 06-11:00 07-9:00

  12. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA PRESENTATION OF RECENT DATA

  13. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA PRESENTATION OF RECENT DATA

  14. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA • NEAR TERM PLANS • Test Activity • Gas Analysis • Cold agent testing on-going since latter Feb ‘02 • Difficulty getting agent temperature to -65°F • Process refined • Testing continuing now (12-15March02) • Will find acceptable distribution profiles for two air flow conditions • Air flow conditions => high flow/low temperature & low flow/high temperature • Closure analysis will include : • Distribution profile measurements at agent storage conditions during fire testing • Distribution profile measurements for agent storage conditions at depressed temperature

  15. International Aircraft Systems Fire Protection Working Group Seattle-Tacoma Airport, WA 12-13 March 2002 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405 USA • NEAR TERM PLANS • Test Activity (cont’d) • Fire Testing • Will follow on immediately after agent distribution work at depressed temperature is completed (mid-March ‘02) • Basic fire characterizations completed

More Related