70 likes | 303 Vues
Safety and Mission Assurance Monthly Status Report (MSR) December 2012. Jorg Fischer, PFP MAM. SMA SUMMARY. Supported the monthly ESD Control survey – no issues Supported the monthly calibration checks – no issues
E N D
Safety and Mission Assurance Monthly Status Report (MSR) December 2012 Jorg Fischer, PFP MAM
SMA SUMMARY • Supported the monthly ESD Control survey – no issues • Supported the monthly calibration checks – no issues • Provided cleanroom support: cleaning of parts, supply, and maintenance, for all MAVEN cleanrooms • Alert responses: Updated the alert response database - no impact reports for all December alert items. • Continuous inspections of Flight assembly and test areas Provided support for delivery of the instruments to LM • Provided support for S/C integration at LM • Polymerics: Mix record database, updated. Performed polymeric witness sample testing, filing, inspections, and close-out. • Performed FLT document reviews, and updates for the EIDP
SMA SUMMARY • Supported the delivery of Flight Instrument to Lockheed Martin, CO and S/C integration activities of the Instruments • Cleanroom Training at LMCO • Instrument unpacking and set up for post ship CPT’s • Instrument Installation oversight • Harnessing of instruments • General technical and QA support at LMCO • Support of SWEA – Tuning efforts, repair/rework, and testing of the SWEA instrument. • SWEA HV Board – Post Anomaly Inspections • SWEA PreAmp Board – Removed and Replaced all Preamps • Assembly and Disassembly Technical activities and Inspection
PFR Detail • Updated PFR/NCR/LL data base • PFR status report list sent to GSFC - weekly • Provided assistance to SSL engineers with PFR form and related item close-out documentation PFR Status (12/27/12): • Problem count 132 • MRB problems: 87 • NCR problems: 40 • Closed: 120, Open: 5, VOID:5 • Monitor: 3 (SWEA PFR 059, 115, 122) • Open Problems: 3 MAVEN_PFR _128_STATIC_RTD_Thermo-couple_test MAVEN_PFR_130_NCR_SWEA_TVAC_Test MAVEN_PFR_131_SWEA_TVAC_Power_Supply_Instability
SMA Other activities include the normal, ongoing participation in instrument and FRB/MRB meetings, discussions, reviews and comments. SSL SMA provided continued operator training and re-certification services, stockroom, shipping, chemical inventory, ESD control, and safety checks.
SMA SUMMARY – Concerns • All PRFs are worked to close and will be addressed at a MRB/FRB closure meeting at the beginning of January • All concerns are well understood and are closely monitored by SSL and GSFC QA. • Pending – SWEA