1 / 5

8-ID Recent Activity

8-ID Recent Activity. 8-ID General New resident post-doc Martin Tolkiehn Started 4/10/2006 Sharing office with Xuefa Li X-Ray Standing Waves and Wave-Guide experiments Supporting some 8-ID-E and 8-ID-”G” experiments Interesting experiments in recent weeks: 8-ID-E Super-solid He

leroy
Télécharger la présentation

8-ID Recent Activity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 8-ID Recent Activity • 8-ID General • New resident post-doc • Martin Tolkiehn • Started 4/10/2006 • Sharing office with Xuefa Li • X-Ray Standing Waves and Wave-Guide experiments • Supporting some 8-ID-E and 8-ID-”G” experiments • Interesting experiments in recent weeks: • 8-ID-E • Super-solid He • Cr CDW XPCS

  2. 8-ID-E & G Recent and Upcoming Activities • Plan to replace E monochromator exit window and crystal holder during shutdown • Eliminate D-E air path • Allow eventual removal of 8-ID-A Be window • GISAXS vacuum-chamber-to-flight-path connections being modified to eliminate sample motion arising from bellows vacuum-loading • E set-up (Si(220)---microdiffraction) will be enhanced: • Channel-cut crystal to reduce harmonic contamination • Simple fluorescence set-up (to minimize use of 1-BM) • Microdiffraction and zone-plate-based XPCS

  3. 8-ID-I Recent and Upcoming Activities • Installation and initial testing of the new pseudo channel-cut monochromator for 8-ID-I has been completed • Team effort: Suresh (and Michael and Alec), deming Shu, Harold, AES-MOM, AES-MED, AES-SI and AES-BCDA • Some scary moments over the past few weeks: • Χ-motion yoke on 2nd crystal blocked line of sight to 1st crystal • Partial vent after installation at the end of the beamline---thought we had broken a Be window; tested Jeff Alicz’s new procedure for suspect Be contamination clean-up • Ge(111)-monochromatized beam was found only a few hours after first opening the shutter!!

  4. 8-ID-I Recent and Upcoming Activities • Piezo and picomotor fine pitch adjustment of Χ and θ of second crystal via flexure pivots • UHV linear-stage-driven rotation of 2-crystal (Ge(111) assembly • Ethernet and serial controls via EPICS 3.14

More Related