An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hardware Commissioning ReviewBDI Equipment R. Jung, on behalf of the BDI LHC Technical Board

  2. Hardware Commissioning Review& BDI Equipment • BDI equipment is not part of the Hardware commissioning proper • BDI may/will interfere with the Hardware Commissioning due to late monitor deliveries • BDI equipment is mainly concerned by the commissioning with BEAM • Different categories, with different impact: • Large distributed systems over whole LHC • Many specialised systems in small numbers around IP4, injection and dump extraction

  3. BDI systems installed in LHC tunnel • Two big distributed systems: BPM & BLM • Two Luminosity Stations: IP1 & IP5: US LARP: pb • Special systems at Injections & Extractions/Dump lines • Many special systems installed around IP4: • BCTs: Fast and DC monitors • Special Pick-ups for Tune, Chromaticity • Transverse Profile Monitors: BTV, BWS, BSRT, BGIH/V • Longitudinal Profile Monitors: WCM Our reference: Sylvain Weisz’s planning Our Aim: ready for the LHC start-up: July 2007

  4. Large Distributed Systems • BPMs: • Arcs: follow SSS planning: OK • Others: Just In Time : BPM_A Q7R8 • Warm BPMs: may be JIT for LSS8 end • Electronics: small pb with delay lines order & deliv: • 4 cards/Q may have to be installed later: access needed • BLMs: • 4000 ICs production will start in Prodvino: ~JIT; if not: install 2 ICs / Q and come back later: Access • Last IC installation after interconnect closure only • IC on passage to be installed after last transport • ~340 SEMs for SSS, IR3 & 7, after IC production

  5. Special & Small Quantity Systems [IP4] • BCTs • Available for installation in June/July 2006 • Special Pick-Ups • JIT, including Schottkyfor the moment • Transverse profile Monitors • BTV in IP4 + elsewhere in ring & dump: JIT for IP8R • Wire Scanners: JIT • BSRT: JIT • BGIH/V: fragile equipment to be installed as late as possible • Longitudinal Profile monitors: RF WCM: OK Interference with start of RF tests [15/06/06] Little interference with RF commissioning: 11/06 – 5/07

  6. Open questions: IP4 & Dump Lines • IP4: Access to UA43 & 47 (ex klystron galleries) during RF tests & commissioning: shielding • Dump Lines • Exact location & dimension of vacuum chambers for BCT and screens to be defined with AT/VAC and AB/BT to start ASAP the mechanical design of these BCTs and special large screen[ROI] BTVs. • Planning