Estudio de Sobrecargas en transformadores de Distribución

Estudio de Sobrecargas en transformadores de Distribución. Sesión técnica 3 – Sistemas de gestión en distribución -. Integrantes: Benucci, Gianni Leonardo Mazzeo , Sergio Antonio Puccini Andres Fabian. Alim 1. Alim 2. Alim 3. PMRA. PMRA. PMRA. PNT 1. PNT 1. PNT 1. PMRC. PMRC.

lexine
Télécharger la présentation

Estudio de Sobrecargas en transformadores de Distribución

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Estudio de Sobrecargas en transformadores de Distribución Sesión técnica 3 – Sistemas de gestión en distribución - Integrantes: Benucci, Gianni Leonardo Mazzeo, Sergio Antonio Puccini Andres Fabian

  2. Alim1 Alim2 Alim3 PMRA PMRA PMRA PNT 1 PNT 1 PNT 1 PMRC PMRC PNT 2 PNT 2 PNT 2 PMRC PNT 3 PNT 3 PNT 3 PNT n PNT n PNT n

  3. Alim1 Alim2 Alim3 PSBT PSBT PSBT PNT 1 PNT 1 PNT 1 PNT 2 PNT 2 PNT 2 PNT 3 PNT 3 PNT 3 PNT n PNT n PNT n

  4. Alim1 Alim2 Alim3 PSBT PSBT PSBT < > > PNT 1 PNT 1 PNT 1 + + + PNT 2 PNT 2 PNT 2 + + + PNT 3 PNT 3 PNT 3 + + + PNT n PNT n PNT n

  5. Alim1 PSBT > PNT 1 PSBT = PST 1 + PST 2 + PST 3 + PST 4 Para nuestro estudio utilizaremos energía + ESBT = EST 1 + EST 2 + EST 3 + EST 4 PNT 2 ETC n _______ Factor de aporte FS n = ETCT + FS1 + FS2 + FS3 + . . . + FSn = 1 PNT 3 PST n = FSn . PSBT + PNT n

  6. Alim1 PSBT > PNT 1 PST n + _______ Factor de sobrecarga NS n = PNT n PNT 2 + Ns > 1 Ns < 1 PNT 3 + PNT n

  7. Verificación en campo Alim1 Alim3 PSBT PSBT < > Preg 1 PNT 1 PNT 1 + + PNT 2 Preg 2 PNT 2 + + PNT 3 PNT 3 Preg 3 + + Preg n < ± 5 % . PST n PNT n PNT n

  8. Factores que atentan contra el método • Clientes importantes que se hayan incorporado o dado de baja recientemente. • Variaciones significativas en la potencia de los clientes. • Clientes mal vinculados en el sistema. • Clientes clandestinos.