1 / 18

Opening Remarks

Opening Remarks. Alex Dzierba. GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003. Welcome. Prof. Hara Pertidou U of Thessaloniki - Greece Prof. Jim Pinfold U of Alberta - Canada Prof. Marco Reyes U of Guanajuato - Mexico .. And other visitors and thanks to our JLab hosts.

libby
Télécharger la présentation

Opening Remarks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003

  2. Welcome Prof. Hara Pertidou U of Thessaloniki - Greece Prof. Jim Pinfold U of Alberta - Canada Prof. Marco Reyes U of Guanajuato - Mexico .. And other visitors and thanks to our JLab hosts

  3. Good News

  4. 20-yr Plan

  5. From Congress

  6. Senate

  7. Reviews • Electronics - July 2003 • Calorimetry & Tracking • Software • Theory? • Lehman review (~ 1 yr)

  8. Software Issues • PWA and phenomenology • NSF PWA center - GlueX/CLEO-c • Other proposals • Simulations/Reconstruction • Ed Brash/Richard Jones/Maciej Swat • Lehman review preps • GRID • Coordinate with Lab • G. Fox • DAQ • Coordinate with Lab/Tim Smith?

  9. System Requirements

  10. Funding • Coordinated NSF/DOE supplementals • CDRF and ISTC - US/Russia • Joint Canada/Mexico/US • Requests for R&D to JLab • Theory requests • Computer science

  11. Collaboration Commitment • Nature of MOU’s • Physicists • Technical Staff • Other experiments • Adding/Removing Collaborators • Guidelines • Implementation

  12. Equipment that Could be Completed • Magnet • End-plate holes? • Energize at IUCF? • LGD • Evaluate glass/pm’s • Frame, wall, monitor • Electronics

  13. Projects that could be completed soon • Development of amplitude parameterization • isobar model • Deck effect • unitarity, analyticity, • particular attention to incident photons

  14. Equipment Issues • Tracking • Design & manpower? • Vertex region • Calorimetry • Barrel readout • Prototypes • Upstream • Particle I.D. • Re-visit Cerenkov • TOF - OK • Magnetic issue • Forward/Cal - TOF - Cerenkov package

  15. Infrastructure • Building • Can we go to architect? • Beam • Beam line design • Tagger design • Tagger magnet • Coherent multiple scattering? • Subsystem Integration • Use BarBar as paradigm

  16. Schedule • Current schedule is painfully slow • Build the Hall and beamline before upgrade • Investigate physics at lower energy • Stage equipment installation

  17. Analysis/Phenomenology • Amplitude Analysis • Understand ambiguities • Improve algorithms/throughput • Analysis of extant data • Phenomenology • Critique of isobar model • Model for backgrounds • Understand ‘theory’ systematic errors

  18. Conclusions There’s a lot to doLet’s get busy

More Related