…And the Band played on: Wind power in the UK under a banded Renewables Obligation

…And the Band played on: Wind power in the UK under a banded Renewables Obligation. Dr Gordon Edge Director of Economics & Markets BWEA. Agenda. A short guide to the Renewables Obligation Government’s change proposals and likely final shape of the system

lindley
Télécharger la présentation

…And the Band played on: Wind power in the UK under a banded Renewables Obligation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. …And the Band played on: Wind power in the UK under a banded Renewables Obligation Dr Gordon Edge Director of Economics & Markets BWEA

  2. Agenda • A short guide to the Renewables Obligation • Government’s change proposals and likely final shape of the system • How long will it take to implement the reforms? • Impacts and conclusions

  3. The RO • An Obligation on suppliers to provide renewable power • Rises to 15.4% in 2015, flat to 2027 • Satisfied by presenting ROCs • Generators awarded a ROC for each eligible MWh generated • Sold to suppliers • Suppliers pay fine (buy-out) if not compliant • Recycled back to suppliers in proportion to the number of ROCs presented

  4. The Reform Package • Banding • Guaranteed Headroom • Buy-out Price Freeze • Ski-slope

  5. Banding • Breaks 1MWh=1ROC link • Some technologies get more, some less • Government looking to support emerging technologies without adding cost to the consumer • Aim to protect existing investment • Avoidance of ‘oversubsidisation’

  6. BWEA response • BWEA calls for a limited number of bands • Mature, near-market, emerging, etc • Government appears to have heeded this call • Banding levels need to be carefully set • Onshore wind should remain at 1ROC/MWh • Offshore wind needs a multiple that provides sufficient revenue to ensure build • Wave and tidal need ‘ROCs plus’

  7. Net neutral banding • Government is aiming to have the number of ROCs in the market roughly equal to the number of ROCable MWh • This will mean what is given through banding up will have to be taken away through banding down

  8. BWEA’s response • Convinced that numbers do not add up for net neutrality • You cannot take enough from cheaper technologies to properly incentivise more expensive ones without stopping the development of the cheaper, particularly onshore wind • Government still looking to implement net neutrality as a “broad aim”

  9. Additional Banding issues • Grandfathering • If onshore wind is moved down from 1ROC/MWh, then very important what criterion is used to judge when a project is grandfathered • Initial multiples • The Energy White Paper will include proposals on initial values • Based on external analysis

  10. Guaranteed Headroom • Obligation post-2015 • Levels set a year ahead at least 1% over expected generation of ROCable MWh • Up to maximum of 20% • Leeway to set Obligation at higher headroom further ahead

  11. BWEA’s response • Call for headroom to be based on a ROC forecast plus a percentage of that forecast • Headroom of 10% of ROC forecast suggested • Government to use ROC forecast; headroom level unclear at present

  12. Breaking the RPI link • For after 2015, Government proposed that the buy-out price would no longer rise with RPI • i.e. ROC value drops every year in real terms post 2015 • Thus rise in Obligation to 20% is not supposed to cost consumers more in real terms

  13. BWEA’s response • Government did not consult on the buy-out freeze • We are objecting anyway • Affects existing, grandfathered plant • Resources needed to fund investment beyond 2015 • Not realistic to expect to get 20% for the same cost as 15% • Hostile response has forced Government to reconsider

  14. Ski-slope • Mechanism to avoid price crash if Obligation met • Implications for RO compliance cycle and cash flows

  15. BWEA’s response • Suppliers strongly objecting • But, it protects against a key risk • Will not be needed for some time • Recommend Government takes enabling power but does not use it until necessary • Time to consult on precise solution that satisfies concerns • Appears to be position in White Paper

  16. Key Demands • Do not freeze the buy-out price • Abandon net neutrality • Keep onshore wind at 1ROC/MWh • Provide sufficient ROC income for offshore wind and marine • Do it quickly!

  17. Timing • Need the uncertainty caused by the reform proposals to be removed quickly • However, changes require primary legislation • Consequently banding cannot start before April 2009 at earliest • Once decision made to band, Government will aim to define multiples quickly • Still not until late 2007

  18. Analysis & Conclusions (1) • Government aims to safeguard current expansion of onshore wind while promoting offshore • We believe the intent • Watching detail carefully to see if it works

  19. Analysis & Conclusions (2) • Reform opens door to regular reviews, perhaps every 5 years • But RO has changed every year • Will have to deal with 2027 ‘drop dead date’ anyway • But uncertainty around change has affected development

  20. Analysis & Conclusions (3) • The EU ‘20% by 2020’ target may mean the UK has to get more than 20% electricity from renewables • Large opportunity, particularly for offshore wind • Will require further reform of the RO, or an additional mechanism on top • Current Energy Review process did not allow for this

  21. Thank you for your attention