Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe. MXS control july 16, 2010. Progress. Feedback from Allen  revisions to GUI code Continuing to work on write-up, user’s manual draft Tested with PCB—saw increasing x-ray counts when LED voltage varied (see next slide)

lindsay
Télécharger la présentation

MXS control july 16, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe MXS controljuly16, 2010

  2. Progress • Feedback from Allen revisions to GUI code • Continuing to work on write-up, user’s manual draft • Tested with PCB—saw increasing x-ray counts when LED voltage varied (see next slide) • Found that op-amps w/ current output need heat sink for best performance • Able to see general effects of changing voltages, but due to MCA time resolution, we can’t see ~100 Hz pulses replicated

  3. MCA readings • LED pulsed with 0 to 3.5V square wave; variable pulse width

  4. Next steps • Primary: • Email Keith to check in • Continue GUI work • Look into heat sink for op-amp, revise PCB • Secondary: • Finish write-up of report/user’s manual • Box implementation • Improvements