An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCT DAQ ID week – October 2013 Bruce Gallop

  2. SCT DAQ • Mostly unchanged • Next run • more occupancy -> data volume • more irradiation -> changing parameters • ROD crates • New RODs and BOCs • New fibre mapping • Software ID week – November 2013 - Bruce Gallop

  3. ROD updates • Now have RODs and BOCs to fill 8 crates • Up from 90 to 128 • Installed and fibres remapped in the barrel • Endcaps to come • Dual HOLA, duplicate data stream for FTK • Installed in new BOCs • Check mapping with modules off • Current through PIN, low power ID week – November 2013 - Bruce Gallop

  4. Software • External constraints • tdaq, slc6, 64bit, new gcc • Calibration updates • Threshold – look at scan ranges • Noise – low occupancy and low thresholds • Monitoring • Better monitoring on ROD (at L1A rates?) • Configuration ID week – November 2013 - Bruce Gallop

  5. ROD Firmware • Updates to ROD firmware for ROD busy • Previously, some issues in the formatter • Now also looking at controller FPGA • Possible issue with event counting after busy • Looks promising • Thorough testing needed to be confident • Issue intermittent, only seen during beam • This is where extra monitoring helps ID week – November 2013 - Bruce Gallop

  6. Conclusion • Hardware progressing well • RODs, BOCs, HOLAs • Software more open ended • Essentials under control (tdaq, slc6 etc) • More work needed for smooth running • Calibration updates • Monitoring • Driver for new TX plugins ID week – November 2013 - Bruce Gallop