1 / 6

Beam Profile Monitor

Beam Profile Monitor. Status Immediate Objective Materials needed Projections Conclusion Anthony Tatum University of North Carolina Wilmington. Status. Located in trailer 94 B Good condition from first observation. Objective. Set up DAQ

louise
Télécharger la présentation

Beam Profile Monitor

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam Profile Monitor • Status • Immediate Objective • Materials needed • Projections • Conclusion Anthony Tatum University of North Carolina Wilmington

  2. Status • Located in trailer 94 B • Good condition from first observation

  3. Objective • Set up DAQ • Test all channels (x,y), data cables, high and low voltage cables • Evaluate PMT’s, Amplifier, Discriminator • Possible Problems • Optical leakage • Loose connections • Faulty sub-system

  4. Materials Needed • Signal Cables • High and Low voltage cables • High and Low voltage power supply • DAQ system • Carl Zorn • Electronics Group

  5. Projection • Set up entire system for testing • Determine functionality and identify problems if they exist • Expected Completion Friday, July 16th

  6. Conclusion • We’ll have the best looking Beam in town! Anthony Tatum atatum@jlab.org 910 538 5975

More Related