1 / 9

IE 312 Project

IE 312 Project. This is a group project . You can form your own group of 2-3 people in each group. If you have problems finding partners let me know as soon as possible and I will pair you up The project is due on December 7 th There are three deliverables :

Télécharger la présentation

IE 312 Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IE 312 Project • This is a group project. You can form your own group of 2-3 people in each group. If you have problems finding partners let me know as soon as possible and I will pair you up • The project is due on December 7th • There are three deliverables: • Twohigh-level PowerPoint presentations • A technical report IE 312

  2. My Expectations • Use LINGO with SETS • The grading will be: • How well you formulate this problem (50%), • How well you code your formulation in LINGO (15%), • How well you interpret the output (15%), and • Quality of your Powerpointpresentations (20%) • No single correct formulation for the problem: • Assumptions will have to be made • Make sure all of them are well justified • Use sensitivity analysis in interpreting the output IE 312

  3. Problem Background • You will work as an operations research analysis for the Scottish conglomerate McBain International, the world’s leading producer of Haggis, a Scottish delicacy. • After conducting extensive market research, McBain has decided to add two new flavors to its product line: Mexican Haggis and Taiwanese Haggis. • The new haggis products will be produced at its USA Midwest facility, located in Ames, IA. • This facility currently makes only American and Vegetarian Haggis, and it was chosen due to its current low utilization IE 312

  4. IE 312

  5. There’s a problem … • Production is scheduled to start in January 2013. • Unfortunately manufacturing engineering at the USA Midwest recently reported that they will be unable to meet the demand for the new products without adding an overtime shift. • This was discovered when they attempted to put together a production schedule for January IE 312

  6. Your boss has a perspective … • Given the current utilization and the expected demand for the new products, your boss is convinced that the facility can handle the production, and she has asked you to help the USA Midwest facility fix the problem. • Given the current economic climate, your boss has made it clear that she does not want to pay for any overtime or additional capital investments. IE 312

  7. You’ll need to find a solution • Use your expertise to find the optimal solution to this problem. • If you believe that you have insufficient information, you can make assumptions (if they can be justified) • You will need to write a report, which may use optimization jargon (5 pages), as well as two PowerPoint presentation to be given to your boss • Your recommendations should be available by December 7th IE 312

  8. Project Presentation Due 11/16 • Rhetorical Issues • Audience – Management outside engineering • Context – Introducing new products causes a problem with production scheduling • Purpose – Convince management that you are the right team to solve the problem • Formatting Issues • Slide 1: Overview of problem • Slide 2: Describe at a high level how optimization is the answer to the problem. What can optimization do? • Slide 3: Outline your proposed solution approach IE 312

  9. Bon Appétit …… Haggis with Neeps and Tatties IE 312

More Related