SlideServe
Menu
Préférences
© SlideServe · v2026

Comprehensive GEOPAK Road Training for Preliminary Bridge Design

malik-lott avatar
10 diapositives · 237 Views · Oct 27, 2014

Join our expert-led GEOPAK Road training sessions focused on Preliminary Bridge Design. This course covers essential topics including Coordinate Geometry (COGO), horizontal and vertical alignments, digital terrain modeling, and cross-section sheets. Classes run from 8:00 AM to 3:30 PM, with breaks and lunch included. Facilities feature restrooms, a break room, and accessible parking. Gain hands-on experience with GEOPAK modules to enhance your design skills and ensure successful project outcomes. Contact instructors Steve Atkinson, Bill Politte, Kevin Vollet, and Chris Schwandtner for more information.

Comprehensive GEOPAK Road Training for Preliminary Bridge Design - slide 1
01 / 10Comprehensive GEOPAK Road Training for Preliminary Bridge Design
1 / 17

Télécharger la présentation

Comprehensive GEOPAK Road Training for Preliminary Bridge Design
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. GEOPAK RoadFor Preliminary Bridge Design

  2. Instructors Steve Atkinson Bill Politte Kevin Vollet Chris Schwandtner (573) 751-5651 (573) 526-4447 (573) 526-5176 (573) 526-5264

  3. Instructors Bill Politte Bill Politte Bill Politte Bill Politte (573) 526-4447 (573) 526-4447 (573) 526-4447 (573) 526-5264

  4. Facilities • Restrooms at either end of hallway • Break room at “upper” end of hallway • Coffee through the door to your right • Parking • Parking out front • Adjacent lots

  5. Schedule • Begin at 8:00 a.m. • Go until 3:30 p.m. +/- • 1 hour lunch • 11:30 a.m. +/- • Finish sometime on Friday

  6. Class Overview • Already Covered • Introduction to GEOPAK (Chapter 1) • Coordinate Geometry—COGO (Chapter 5) • Graphical COGO—optional (Chapter 6) • Horizontal Alignments—optional (Chapter 7) • Design & Computation Manager (Chapter 8) • Plan View Labeler (Chapter 9) • Proposed Vertical Alignments (Chapter 11) • Setting Up a New Job • Start Job (Chapter 2) • Project Manager (Chapter 3)

  7. Class Overview • Existing Conditions • Digital Terrain Modeling (Chapter 4) • Existing Ground Profiles (Chapter 10) • Plan & Profile Sheets (Chapter 12) • Superelevation (Chapter 14) • Valley Cross Sections and Reports (Chapter 13 & 19)

  8. Class Overview • Optional (as time permits) • Port Viewer (Chapter 16) • Earthwork (Chapter 17) • Cross Section Sheets (Chapter 18) • Cross Section Sequence • Original Ground Cross Sections (Chapter 13) • Proposed Cross Sections (Chapter 15) • 3D Modeling (Chapters 19 & 20)

  9. Directory Structure • t:\br-proj#\ • # - user number on top of screen • User1 t:\br-proj01 • User2 t:\br-proj02 • User3 t:\br-proj03 • User4 t:\br-proj04 • User5 t:\br-proj05 • User6 t:\br-proj06 • User7 t:\br-proj07 • User8 t:\br-proj08 • User9 t:\br-proj09 • User10 t:\br-proj10 • User11 t:\br-proj11 • User12 t:\br-proj12 • User13 t:\br-proj13 • User14 t:\br-proj14 • User15 t:\br-proj15

  10. GEOPAK Road For Preliminary Bridge Design