1 / 28

Company profil Participation on the transport infrastructure modernisation

Main Point of Presentation. Company profil Participation on the transport infrastructure modernisation Possible contribution to the Group competitivness improvement. 1991. STAVEBNÍ GEOLOGIE - GEOTECHNIKA, a.s. 1993. 51 % shares. SIMECSOL. 49 % shares.

mare
Télécharger la présentation

Company profil Participation on the transport infrastructure modernisation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Main Point of Presentation • Company profil • Participation on the transport infrastructure modernisation • Possible contribution to the Group competitivness improvement

  2. 1991 STAVEBNÍ GEOLOGIE - GEOTECHNIKA, a.s. 1993 51 % shares SIMECSOL 49 % shares Group of managers and specialists of SG - Geotechnika a.s. 2002 ARCADIS – France EEG - SIMECSOL(54 % shares) Ownership

  3. Important Figury Basic Information • Headquarters: Prague • Staff: 175 • Turnover: 9 000 000 Eur • Registered capital: 1 551 900 Eur • Capital structure: 54 % - Arcadis – France 46 % - manager and specialists of SGGT • Core business: - Consultancy, Supervision • Engineering Risks Management • Apllied Research in the fields of civil engineering, geotechnics, foundation of structures and enviromental protection

  4. Engineering activity and geotechnical constructions design BRNO PRAHA Geophysics PLZEŇ Pavement and stone cladding works Geotechnical engineering SLOVAKIA Subsidiary Companies Mining engineeringRehabilitation of underground constructions OSTRAVA

  5. Development of Total Revenues 1 Euro @31 CZK

  6. Development of Equity 1 Euro @31 CZK

  7. Participation of SG on the modernisation of the transport infrastructure • Prague urban traffic system • Motorways • Railways corridors

  8. Prague ring traffic system

  9. Prague ring traffic system Prague ring – part Řepy - Ruzyně

  10. Prague ring traffic system City ring Mrázovka tunnels

  11. Prague underground Prague underground

  12. Prague underground Prague underground Prague Metro line IVC1 – single-track Metro tunnel tube ready for launching under the Vltava River

  13. Prague underground Kobylisy – large-scale undergroundcavern in difficult geological condition Kobylisy – single-aisle metro station before and today

  14. Motorways

  15. Motorways D8 motorway – Panenská tunnel Olomouc road ring D5 motorway – Valík tunnel

  16. Railways corridors Railways corridors

  17. Railways corridors Railways corridors Modernization of the 1st railway corridorMlčechvosty tunnel face – approach retaining wall from reinforced soil Modernization of the 1st railway corridor rehabilitation of Mariánská skála Modernization of the 2st railway corridorBřeclav - Hodonín – landslide rehabilitation

  18. Possible contributions of SG - Geotechnika, a.s. to the improvement of the competitivness of the Group Special technologies • Reinforced soil structures • Matematical modeling of geotechnical problems • In situ testing and measurement

  19. Special technologies - VELKÁ VRANČA - HRDINKA ROAD Special technologies - VELKÁ VRANČA - HRDINKA ROAD • Activities • design of reinforced embankments • design of spacing and length of nails • supervision over formations execution • operative modifications • of reinforcement according to local conditions • installation of extensometers for geosynthetic reinforcement stretching monitoring • evaluation and interpretation of measurements

  20. Kněžice - Bridge Reconstruction • Activities • construction-technical survey preparation • construction design preparation • execution of works

  21. Chabařovice - Landfill Chabařovice - Landfill Project Description Expert assessment of Chabařovice landfill deformations and rehabilitation measures proposal Activities • additional IG survey • stability and deformation assessment of the northern slopes of the landfill • design of slope securing in several variants - pile wall, stabilizing fill

  22. Possible contributions of SG - Geotechnika, a.s. to the improvement of the competitivness of the Group In situ measurement • Tunnel monitoring • Georadar • Laser scanner • Database monitoring system BARAB

  23. D8 Motorway – Panenská Tunnels D8 Motorway – Panenská Tunnels • Activities • complex geo-monitoring • geological documentation of faces • convergence and extensometric surveying • geodesic surveying of portals and surface subsidence • measurement of stress in primary lining • measurement of tension at the rock primary lining interface • surveying of primary and secondary lining shape • surface objects passportization • geotechnical supervision • consulting services for the investor

  24. In situ measurements Georadar • Bridge structure filling material diagnostics using a combination of non-destructive geophysical methods • seismic tomography • georadar

  25. In situ measurements - Laser scanner Digital model of the massif part intended for removal – basis for volume calculation View of supporting poles of the crypt in form of point cloud Expanded part of the surveyed tunnel lining – color differentation of heights - map of deviations from the design Display of a part of Fontain tunnel as a point cloud

  26. In situ measurements

  27. Thank you for your attention www.geotechnika.cz

More Related