An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RHIC Operation Status Yun Luo, yluo@bnl.gov ( 2012 June 26, Time Meeting )

  2. Operation Updates In the last week of 2012 Cu-Au run, we suffered 3 days of high temperature and a thunder storm on Friday which caused power line disconnection. We continued improving blue bunch intensity: Highest Blue bunch intensity: 5.3e9 at injection ( Fill 17014 ), 4.4e9 at store ( Fill 17014 ). Highest Yellow bunch intensity: 1.5e9 at injection, 1.4e9 at store ( Fill 16993 ). Highest initial Phenixrate 64kHz ( Fill 17014). Star calorimeter test at IP2 more than 30hours. All detectors reached their goals by Sunday morning. Major Machine Failures: Wed: 1002A A/C problem, ~7 hours loss, followed by several failed ramps: Blue QLI, Yellow BBQ locking, BA1 tripped Fri: Power dip caused by thunder storm in the afternoon Sat: H10 diagnosis and repairing delayed recovering Sun: 96 faraday cup stuck in Linac beam pipe

  3. Beam Intensities & Experiment Rates 2 QLI Pre-fire QLI bo6tq5 Power-dip / Power line splice~8hrs /H10 failure 96f cup stuck A/C Failure others

  4. Integrated Luminosity ( C-AD ) Phenix Star

  5. Thank you to everyone!