1 / 10

MUST HAVE

MUST HAVE. SHOULD HAVE. COULD HAVE. Module # 060. Designing a Qi system. Objectives: Know the steps involved in designing a system Be able to identify Channels Be able to identify Material Paths What are the steps? Evaluate physical equipment – determine: # of channels (instruments)

Télécharger la présentation

MUST HAVE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MUST HAVE SHOULD HAVE COULD HAVE Module # 060

  2. Designing a Qi system • Objectives: • Know the steps involved in designing a system • Be able to identify Channels • Be able to identify Material Paths • What are the steps? • Evaluate physical equipment – determine: • # of channels (instruments) • # of Material paths (ingredients) • # of Qi,s • # of Qi bridges (Qi’s with comms interfaces installed)

  3. Hardware Control Configuration & Setup Sequence • Plan hardware options (scale, flowmeter cards, etc) • Construct (install cards) • Calibrate instruments • ------------------------------------------------------------------------------ • Plan PAC configuration (# Material Paths, Channels) • Configure PAC database • Commision Materials and Channels • Optimize PAC parameters • ------------------------------------------------------------------------------

  4. Material Paths & Channels MP4 MP5 GIW MP9 MP1 MP2 MP3 GIW Chan 4 Chan 2 Chan 1 MP6 MP7 LIW LIW Each Channel and Material Path has a page of parameters in the Qi, which must be configured Hint: MP8 destination is “don’t care” and must then be set to 255 Chan 3 MP8 LIW

  5. Hardware required? • Total Scales = 3, which is 2 scale boards • Total Flowmeters = 1, which is 1 board • Comms Interface = 1, which is 1 board • Total = 4 boards, we therefore need a total of 2 x Qi’s • Qi #1 : 1x Scale, 1x Scale, 1x Comms interface • Qi #2 : 1x Flowmeter board

  6. Flowmeter Scale IP Add: 100.100.100.1 Matroller ID = 1 Our own Training Stand in more detail

  7. Our planning Table

  8. Flowmeter Scale IP Add: 100.100.100.1 Matroller ID = 1 Our Training stand MP1 GIW GIW MP7 CH2 CH1 MP3 LIW

  9. Review Questions • Is the discharge valve a Material Path? • What is the destination channel for: • MP1 ? • MP3 ? • MP7 ?

  10. 060 - Revision notes • Each scale or flowmeter is counted as a channel in the Qi database • Each material that is added is a Material Path in the database • A discharge from a scale is also a Material Path • LIW, discharges and flow meters have “Destination Channels” which MUST be entered correctly, the default value will not work. • Draw up a table with a row for each MP. The number of columns is up to you depending on how many parameters you feel like listing.

More Related