1 / 8

Pre-Disaster Mitigation Grants 2012

Pre-Disaster Mitigation Grants 2012. Presented to Palm Coast City Council December 20, 2011. FIVE YEAR GOALS Maintain a Safe Community MAJOR PROJECTS Water Control Structure (one replacement per year). CITY COUNCIL GOALS AND OBJECTIVES 2011 & 2012. Canal Control Structures 5-Year Plan.

meir
Télécharger la présentation

Pre-Disaster Mitigation Grants 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011

  2. FIVE YEAR GOALS • Maintain a Safe Community • MAJOR PROJECTS • Water Control Structure (one replacement per year) CITYCOUNCIL GOALS AND OBJECTIVES 2011 & 2012

  3. Canal Control Structures 5-Year Plan COPC Eligible for Structure Waterway Rating FEMA Funding Year R-1 Royal Palms 11 Yes 2012 BT-2 Bellaire 11 No 2013 L-1 Sesame 9 Yes 2014 M-2 Mulberry 9 No 2014 I-1 Iroquois 9 Yes 2015 I-4 Ulysses (N) 9 Yes 2015 I-6 Ulysses (S) 9 Yes 2015 L-4 Royal Palms 9 No 2016

  4. Three Sisters General Location

  5. 186 cfs @ NWL 20.0’ 725 cfs @ NWL 15.2’ 420 cfs @ NWL 20.5’ 119 cfs @ NWL 21.0’

  6. Three Sisters Design Considerations • Over the last 2 years, many designs were considered, and eliminated: • A bridge would be required to maintain and construct a single weir. • Each waterway has a different elevation and flow rate. • The stilling basin before the culverts under I-95 attenuates and reduces water velocities. • The proposed design has been permitted by the SJRWMD. • A new design would require withdrawal of the PDM Grant application. • With new design elevations, the new permit would require stormwater and groundwater modeling.

  7. Three Orphans General Location

  8. QUESTIONS ?

More Related