1 / 5

Reload PFV September 12, 2012

Reload PFV September 12, 2012. Reload PFV. Concern that need to be addressed: The RC need to have an option in PFV to allow gradual reload of markets and non markets during TLR level 3 , 4 or 5 events.

meryl
Télécharger la présentation

Reload PFV September 12, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reload PFVSeptember 12, 2012

  2. Reload PFV • Concern that need to be addressed: • The RC need to have an option in PFV to allow gradual reload of markets and non markets during TLR level 3 , 4 or 5 events. • Without the option of a gradual reload in PFV, a reload situation without capping the net impact of markets and non markets could cause an unexpected sudden increase of the real time loading of the flow gate above the SOL that was not anticipated by the RC and could not have been anticipated by the RC. • The RC doesn’t know how much economic dispatch potential of markets and non-markets was temporary re-dispatched during a TLR level 3, 4 or 5 event to resolve the congestion and maintain the flow gate loading below limit.

  3. Potential GTL impact SOL Flow gate Real time MW total flow Flow gate GTL Real time Forecasted Flow Next hour GTL Next hour Potential economic dispatch of markets and non-markets that was temporary re-dispatched to resolve the congestion. Unknown to the RC how much MW TAGS Impact CH 100% reload TAGS Impact 100% reload Other Other value CH Current hour Next hour Calculation for next hour TLR 3A re-issued or TLR 5A CONCERN TLR in effective several hours

  4. Potential GTL impact SOL Flow gate Real time MW total flow Flow gate GTL Real time Forecasted Flow Next hour GTL Next hour PFV allows RC to set a max flow Target for reload. MW TAGS Impact CH 100% reload TAGS Impact 100% reload Net GTL Target Market / Non Market Other Other Value CH Current hour Next hour Calculation for next hour TLR 3A re-issued SOLUTION TLR in effective several hours

  5. Reload PFV • Solution • PFV software allows the RC to set a max flow Target for a reload situation. (see example previous slide) • In that situation the Markets and Non-Markets will still get a net GTL Target that is higher than their current hour net GTL impact. The Target will be based on their current impacts calculated from real time plus a calculated reload value. • The reload value will be allocated to the GTL of Markets and non-Markets based on their >5% FWD impact. For TLR level 3 based on the Non Firm >5% FWD GTL impacts and for TLR Level 5 based on all >5% FWD GTL impacts. • Full reload without Targets for Markets and Non Markets will only occur if a TLR level 1 or 0 is issued.

More Related