20 likes | 116 Vues
This draft outlines steps for regional haze State Implementation Plans (SIPs), including identifying pollution sources, analyzing improvements, and establishing goals tied to long-term strategies. It highlights the importance of baseline conditions, natural conditions, and uniform progress towards better air quality. The document also addresses 2008 SIP revisions, periodic reviews, and FLM coordination. Additionally, it emphasizes the integration of SIP requirements with regional and national environmental objectives.
E N D
*DRAFT* 308 Regional Haze SIP Development Road Map #1 ID Antrop. Sources (d)(3)(iv) #3 List all BART-eligible Sources (e) #5 Determine Base Line Conditions (d)(2)(i) EPA Tracking Progress Guide BART Report? Base Case Models? AofH ? In&Near ? #4 Analyze Improvement (e)(1)(ii)(B) #2 Complete EI Inventories (d)(4) CoH ? #6 Determine Natural Cond. (d)(2)(iii) EPA Natural Cond. Guide CALPUFF ? EDMS On-line? #7 Calculate Glide Path Unif. Improv. (d)(1)(B) Work Plan Forumla CALPUFF Alt? EDMS Data? GOTO #5 2018 Proj Models?
*DRAFT* 308 Regional Haze SIP Development Road Map, continued #8 Establish RP Goals (d)(1)(A) #10 Develop LTS (d)(3)(v) LTS Developed ? #11 Tie LTS To Goals, RP Yes Integral Vistas? (51.304) F1 Compl. Cost F1 RAVI, etc F4 Retiremt Repl. All CIAs Completed? F2 Time F2 Constr. Act. F5 SMP Ag/F GOTO #5 Existing SMP No F3 Energy,Non- Air F3 Schedules Limits F6 Enforcmt. Contr. #12 Tie to Regional and National Goal F4 Useful Life • #13 Other SIP Requirements: • 2008 SIP Revision (f) • 5 year periodic review (g) • 5 year adequacy (h) • (4) FLM Coordination (i) • and 51.302 • (5) NSR (51.307) NOTE: Flowchart does not show procedures for optional trading program (e)(2); development of goals for slower rate of progress (d)(1)(ii); resolution of goal disputes (d)(1)(iv); or where other States cause or contribute to impairment (d)(3)(i)-(iii). #9 Goal Consultation (d)(1)(iv)