1 / 13

Merchant Plant Development Status . . . . NEPOOL, NY, PJM, VA

Merchant Plant Development Status . . . . NEPOOL, NY, PJM, VA. MerchantPlants . com. Merchant Plant Reviews . FMG reviews in detail over 450 projects proposed in NE, NY, PJM and VA Starts with ISO Interconnection Requests Reviews Dept of Environ. Protection Files

Télécharger la présentation

Merchant Plant Development Status . . . . NEPOOL, NY, PJM, VA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Merchant Plant Development Status . . . . NEPOOL, NY, PJM, VA MerchantPlants.com

  2. Merchant Plant Reviews • FMG reviews in detail over 450 projects proposed in NE, NY, PJM and VA • Starts with ISO Interconnection Requests • Reviews Dept of Environ. Protection Files • Provides Detailed Information • Ranks by Status MerchantPlants.com

  3. Areas Reviewed – Merchant Plant Development • This review covers Merchant Plant Development in four ISO transmission control areas. • NEPOOL, NY, PJM and VA. MerchantPlants.com

  4. New England Merchant Plant Development Status

  5. Map of Capacity Additions NE Locations of Merchant Plants MerchantPlants.com

  6. Reliability Increases in NE • 13,000 mW • 65% Oil/Gas Capability • Margin Grows to New Heights • Fuel Switching Capability Increased • A New Level of Flexible Generation Supply • Assumes Existing Plants Remain in Service

  7. Proposed Projects MerchantPlants.com

  8. Capacity Added by Year MerchantPlants.com

  9. Capability Additions & Margin 143% 116% 141% 166% MerchantPlants.com

  10. PJM Map A map of the PJM Merchant Plant Locations MerchantPlants.com

  11. New York Map MerchantPlants.com

  12. Proposed Projects in VAP portion of the VACAR Control Area MerchantPlants.com

  13. Characteristics ofMerchant Plant Additions,NE and PJM • New England maintained a high level of fuel switching. • PJM has more simple cycle units that require gas as fuel. • The face of equipment supply is moving toward fewer participants with GE leading. MerchantPlants.com

More Related