ITER Project Status

DESCRIPTION

ITER Project Status. “preparing for an efficient start of ITER construction”. Ned Sauthoff Project Manager U.S. ITER Project Office FESAC 7/27/04. Scope of the ITER Transitional Arrangements*.

1 / 34

Télécharger la présentation

ITER Project Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. ITER Project Status “preparing for an efficient start of ITER construction” Ned Sauthoff Project Manager U.S. ITER Project Office FESAC 7/27/04

  2. Scope of the ITER Transitional Arrangements* • “Joint technical preparations directed at maintaining the coherence and integrity of the ITER design and at preparing for an efficient start of ITER construction” • “Organisational preparations directed at enabling the ITER Legal Entity to enter into effective operation with least possible delay following the entry into force of the ITER Joint Implementation Agreement”

  3. 4 of 7 Central Solenoid Modules Steady-state power supplies pellet injector 15% of port-based diagnostic packages 44% of antenna + all transmission lines,RF-sources, and power supplies Start-up gyrotrons, all transmission lines and power supplies Baffle Roughing pumps, standard components Cooling for divertor, vacuum vessel, … Tokamak exhaust processing system US In-kind Contributions to ITER

  4. Tentative US in-kind contributions by Value(total US in-kind contribution ~ 10%) Cooling for divertor, vacuum vessel, … 4 of 7 Central Solenoid Modules Steady-state power supplies Baffle 15% of port-based diagnostic packages Tokamak exhaust processing system Start-up gyrotrons, all transmission lines and power supplies Roughing pumps, standard components, pellet injector 44% of antenna + all transmission lines,RF-sources, and power supplies

  5. Magnets:Central Solenoid

  6. CS Coil is Composed of 6 Pancake Wound Modules Each Module isslightly larger than the complete CS Model Coil

  7. Central Solenoid Conductor

  8. Mitigating the CS Magnet Technical Risks  Indicates an approved task or secondee-assignment

  9. Typical strand layout as proposed by OST. Diameter is ~0.8 mm. Qualification of industrial suppliers of Nb3Sn strands with increased value of Jc (ITA 11-18) • A Request For Proposal (RFP) was issued in May to 4 US strand vendors for the development and qualification of >100kg of superconducting strand meeting a US-proposed CS specification. • Offers were received from • Oxford Superconducting Technology • Superconducting Systems, Inc. • Supercon Inc. • Outokumpu Advanced Superconductors.

  10. Stress Analysis of Helium Inlet Regions (ITA 11-20) A preliminary analysis using a non-asymmetric 3D ANSYS model of the CS winding pack has been carried out to assess the stress in the helium inlet region. Suggestions for redesign of the welded helium inlet have been made to lower the stress concentration in this area

  11. Conductor Performance and Design Criteria (ITA 11-22) • Sub-size jacketed CICC samples are undergoing testing in the Sultan facility. Both SS and Ti jacketed samples are included to help understand effects on conductor performance. • The adequacy of the present conductor design and cost/performance ratios for design alternatives have been evaluated. • A higher performance conductor design has been recommended and the result has been used to specify the strand for the development contracts.

  12. Weld plate samples provided by JAERI CS Jacket Weld Defect Assessment (ITA 11-23) Fatigue crack growth prediction using a statistical approach in order to estimate lifetime fatigue probability for the CS.

  13. Plasma-Facing Components:Baffle

  14. ITER FW/Shield Design Module 18 of the FW/Shield • 36 modules around torus • Shield module weight 3.6 Tonnes (316 LNIG steel) • PFC area 1.6m2 • PFC weight 0.8Tonnes (Cu+316) • 10% of the first wall area • 45 cm thick (PFC +shield) Module 18

  15. US ITER First Wall Tasks • Development of the welded joint for the first wall leg, suited for cut and re-welding in the Hot Cell • Qualification of the FW panel fabrication methods and to establish the NDT method for the FW panel. • EM Analysis of modules and dynamic analysis of the key. • Detailed design of blanket modules and thermal hydraulic analysis of the shield block and the total blanket system. • Analysis of erosion of the ITER first wall due to plasma impingement

  16. Ion Cyclotron System

  17. Overview of the ITER IC system What it is: • One antenna, eight current straps • Eight rf sources, each feeding one strap in the antenna • 35-65 MHz • 20 MW total power to the plasma • Variable phasing between straps ITER ion cyclotron system block diagram What it can be used for: • Tritium ion heating during DT ops. • Minority ion heating during initial ops. • Current drive near center for AT operation • Minority ion current drive at sawtooth inversion radius

  18. Key: voltage probe fluoroptic temperature sensor

  19. ICH High Power Prototype Fully Assembled

  20. Electron Cyclotron System

  21. ECH on ITER • EC Current Drive (ECCD), off-axis. • EC Heating (ECH), including start-up. • Neoclassical Tearing Mode (NTM) stabilization.

  22. ECH System / Allocations (24) 1 MW, 170 GHz Gyrotrons (EU, JA, RF) (24) DC Power Supplies (not shown) (US) (3) 1 MW, 120 GHz Gyrotrons (US) Transmission Lines (US) Equatorial Launcher (JA) (3) Upper Launchers (EU)

  23. Vacuum Pumping and Fueling

  24. Pellet Injection and Pumping: R&D is starting • US starting R&D work for ITER Pellet Injection System • significant R&D to meet throughput and reliability needs • pressing issues have been identified with IT • ITER pumping packages require no R&D • ITER Pellet Injection workshop attended in May 2004 • Injectors to produce ~4.5mm pellets at up to 32 Hz • ORNL test of ITER guide tube mockup is underway • Gas gun approach for injector is under investigation

  25. Diagnostics

  26. ITER diagnostics landscape

  27. US-assigned Diagnostics • Visible/IR Cameras (upper) • Reflectometer (main plasma – LFS) • MSE • ECE (main plasma) • Interferometer (divertor) • RGA

  28. US ITER Tasks:Diagnostics • Contribute to a Port Engineering Task Force. • Support the ITER IT in the writing of procurement specifications for diagnostic port-based procurement packages.

  29. US ITER Tasks: Other • Tritium Processing (S. Willms/LANL) • Detailed design and integration into overall fuel cycle of tokamak exhaust processing system based on the existing design • Safety (D. Petti/INEEL)  Support and analysis for the latest fusion versions of computer codes MELCOR and ATHENA  Magnet safety • Dust Characterization including mobilization and transport • Materials (S. Zinkle/ORNL)  Support of materials activity

  30. Scope of the ITER Transitional Arrangements* • “Joint technical preparations directed at maintaining the coherence and integrity of the ITER design and at preparing for an efficient start of ITER construction” • “Organisational preparations directed at enabling the ITER Legal Entity to enter into effective operation with least possible delay following the entry into force of the ITER Joint Implementation Agreement”

  31. FY04 US Secondees/Visiting Experts (~3 FTEs) • The present ITER international team consists of 69 persons: 31 from Europe, 21 from Japan, 13 from Russia, 3 from the US, and 1 from China, • US “Secondees”: • Magnets [Naka, Japan] • Nicolai Martovetsky (LLNL) and Philip Michael (MIT) • First Wall/Blanket [Garching, Germany] • Dr. Richard Nygren (Sandia) and Mr. Thomas Lutz (Sandia) • Ion Cyclotron [Garching, Germany] • David Swain (ORNL) and Richard Goulding (ORNL) • Port Plugs/diagnostics [Garching, Germany] • Douglas Loesser (PPPL) Approved Approved Approved Approved

  32. US ITER action items from the 6/04 IT/PTL and PC-3 meetings • consider providing IT staff in the following areas: • codes and standards • scheduling/project management • risk management • integration of heating systems • CODAC • tritium plant layout • name U.S. contact person on CAD, IT and networking • participate in review of the IT’s draft Risk Management Plan • work with the IT risk-mitigation and risk-management for the magnets. • respond to IT-initiated requests physics R&D and physics-design tasks

  33. ITER Organization OFES/ “BPCC” U.S. ITER Project Office The organizationwill evolve

  34. Summary • “Joint technical preparations directed at maintaining the coherence and integrity of the ITER design and at preparing for an efficient start of ITER construction” • The US is engaged in focused R&D and design activities in areas of US in-kind contribution and key project enablers • within the party and • via personnel seconded to the International Team • US emphasis is on risk mitigation via R&D, design, cost-estimation, and innovative procurement • “Organisational preparations directed at enabling the ITER Legal Entity to enter into effective operation with least possible delay following the entry into force of the ITER Joint Implementation Agreement” • The US has selected its Domestic Agency for the ITER Construction Phase • The US has offered to participate in development of the ITER Organization’s Project Management Plan, Risk Mitigation Plan, codes and standards, …. • The US is starting development of its Project Plans • The US ITER Project Office is drafting processes for open team-building