GENERAL PRODUCT ASSURANCE REQUIREMENTS AND MANAGEMENT. Key Documents: PA Plan Tailored to HERSCHELL / SPIRE PROJECT Cleanliness Plan (TBC) Configuration Management Plan Interface documentation High Level Document Tree ref.: Management Structure, ref. HERSCHEL Management Plan (TBW).

mparris
Télécharger la présentation

GENERAL PRODUCT ASSURANCE REQUIREMENTS AND MANAGEMENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GENERAL PRODUCT ASSURANCE REQUIREMENTS AND MANAGEMENT Key Documents: PA Plan Tailored to HERSCHELL / SPIRE PROJECT Cleanliness Plan (TBC) Configuration Management Plan Interface documentation High Level Document Tree ref.: Management Structure, ref. HERSCHEL Management Plan (TBW)

  2. Product Assurance Planning and Documentation Databases for Project Delivery and Integration are available for the following : NCR/ECR/RFW Documentation Drawings

  3. SAFETY ASSURANCE Safety Assurance Requirements Safety Training Key areas: Laser , Cranes, Coolants + other hazards Limited Access to Assembly Integration and Verification (AIV) areas

  4. Assembly Integration and Test Control Cleanliness and Contamination Control Assembly Integration Procedures Testing of GSE Test Readiness Reviews (TRR) Post-test Review/Test Reports All Activities shall be covered by PA Plan, AIT Plan,or ISO9001 procedures for specific areas

  5. QUALITY ASSURANCE CONTROLS Procurement Controls for: Material and Processes EEE component selection Electrostatic Discharge Control Handling, Storage, Packaging, Marking, Labelling Failure modes effects and criticality analysis (FMECA) Single Point Failure, Assessments Worst Case Analysis (Drift / Degradation Analysis) Manufacturing and Assembly Control

  6. Software Product Assurance Software management plan/configuration management plan User Requirements Document Software Requirements Definition Architectural Design Document Detailed Design Document Software User Manual Software Delivery Package Document Design Reviews

  7. Deliveries ACCEPTANCE DATA PACKAGE: Pre-Ship Reviews to review Acceptance Data Packages: Software/Hardware (Inc MGSE) EGSE (Including GSE Software) Inspections: Incoming / Outgoing of subsystems or Units Transportation