The purpose of the SPS RF Faraday Cage project is to upgrade the existing TG3 system to a new CTRV-based system to enhance performance. Objectives include achieving 8 events/ms on the GMT cable and enabling multi-cycling through FESA, utilizing standardized configuration and diagnostics software from AB-CO. The project scope includes replacing TG3 modules in G64 crates with VME system components, along with the preparation of cable bundles, procurement of necessary hardware, and software configuration. Key deliverables focus on documenting the timing system within a unified database and ensuring proper installation.
E N D
SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
SPS RF FARADAY CAGE • PURPOSE: To upgrade the existing TG3-based system with a new CTRV-based system, therefore allowing: • 8 events/ms on the GMT cable. • FESA multi-cycling. • Usage of standard configuration and diagnostics software provided by AB-CO. • Documenting this important part of the timing system in the same central DB as the rest. AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
SPS RF FARADAY CAGE • SCOPE (1/2) • Every G64 crate is composed of TG3s and opto-fanout modules. • Take the G64 crates in groups of two and replace every group by a combination of one VME crate and one G64 crate (no TG3s, only for the fan-out modules). G64 Opto-fanouts Current G64 HW configuration Pulse stretchers Opto-fanouts G64 Front view Rear view AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
SPS RF FARADAY CAGE • SCOPE (2/2): work breakdown • Preparing 7 cable bundles (40 lemo 00 each). • Understanding the current installation in terms of SW and proposing a new configuration. • Procurement of 8 VME systems (crate + CPU), 70 CTRV cards, 35 fan-out cards plus miscellaneous material (fans, passe-cables,…). • Requesting extra Ethernet connections in the BA3 Faraday Cage. • Cabling in BA3 (6 VME crates) and BA2 (1 VME crate). • Software configuration and installation. AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
SPS RF FARADAY CAGE • DELIVERABLES AB/CO/HT - Review of Activities for PS-SPS 2006 Startup