An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Phase IV Review Meeting----Curves September 24, 2012

  2. Curve Summary Chisago

  3. ATP 2 – Curve Radius

  4. Greater MN – Curve Radius Not including the portions of the Metro Counties designated as rural.

  5. Phase I – Curve Radius

  6. Phase II – Curve Radius

  7. Phase III – Curve Radius

  8. Phase IV – Curve Radius Not including the portions of the Metro Counties designated as rural.

  9. ATP 2 – Curve ADT ?

  10. Greater MN – Curve ADT Not including the portions of the Metro Counties designated as rural.

  11. Phase I – Curve ADT

  12. Phase II – Curve ADT

  13. Phase III – Curve ADT

  14. Phase IV – Curve ADT Not including the portions of the Metro Counties designated as rural.

  15. Curve Critical Ranges + Critical Curve ADT for Chisago County was 1900 – 3000. * Currently suggested critical ranges.