An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Trench Rescue JAC Drill Study Session & Review

  2. Making the Trench Safe • Approach • Safety, Shut Down Sources of Vibration • Edge Protection • Laddering / Escape Routes • Monitoring / Ventilation • Sidewall preparation • Strut placement

  3. Approach • Size-up • Approach site to minimize ground-loading and maximize view of collapse zone • Shut down any vibration sources • Secure “responsible party” & interview for information • Establish control zones • Establish Command Post

  4. Safety • Designate a Safety Officer • Ensure Lock-Out-Tag-Out of all potential vibration sources and utilities within trench if present. • Shut down all roadways within 300’ of trench. • Spectator/coworker control (use Law Enforcement). • Begin Confined Space Permit.

  5. Air Monitoring / Ventilation • Monitor air around and in trench prior to ventilating • Record results on permit • Ventilate trench with ducted, forced air prior to and throughout entry operations • Monitor trench again and periodically thereafter • Record results on permit

  6. Edge Protection¾” Plywood – all around area you’re working in

  7. Laddering / Escape Routes

  8. If spoil pile is too near to lip, slide two 2” x 12” boards side-by-side up to pile to stand on as edge protection. Shovel pile back from lip and advance boards one at a time as you progress.

  9. Sidewall Preparation Step One: Step Two:

  10. Sidewall Preparation cont…. Now you’re ready for strut placement

  11. Strut Placement

  12. Bridge (2”x6” or larger) is nailed to edge protection (3/4” plywood) to position ladder and Rescuer for safe access to struts Strut is pressurized on one end by two 4”x4” wedges and held in place from below by one 4”x4” wedge acting as a shelf. Strut is captured on the other end by a socket created from four 12”-long 2”x4”s After wedges are pressurized, wedges are captured with a gusset plate (3/4” plywood, 12”x12”) nailed with 8d nails: 1 in each wedge, 1 in the strut, and 1 toe-nailed into the strong-back.

  13. Shoring Thrust Pressures Shoring thrust pressure fans out against a trench wall from the ends of the struts in a conical pattern. The Harder the soil, the farther the pressure is transmitted through the earth. Each strut exerts approximately 4 feet of concentric force radiating outward providing, in theory, 4 foot safe zones.

  14. Strut Spacing Horizontal strut spacing of four feet on center is recommended in type “C” soils or for any rescue activity.

  15. L.C.E.S. • Remember…. • LOOKOUTS • COMMUNICATIONS • ESCAPE ROUTES • SAFETY ZONES