Download
public improvement hearing 2015 street utility n.
Skip this Video
Loading SlideShow in 5 Seconds..
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - PowerPoint Presentation
Download Presentation
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements -

PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements -

1 Vues Download Presentation
Télécharger la présentation

PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements -

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)

  2. Street Reconstruction Project Areas

  3. Revised Feasibility Report(December 1, 2014) for2015 Street, Utility and Retaining Wall Improvements – Grandview Boulevard

  4. Grandview Boulevard Project Recommendations • Reconstruct Grandview Boulevard – Street, Curb / Gutter, Concrete Aprons • Replace Watermain, Valves, Hydrants, Curb Stops • Replace Sewer Forcemain; Add Mag-Meter Manhole • Replace Storm Sewer Catch Basins; Add Draintile; Add Treatment Structure • Replace Retaining Wall

  5. Existing Street Conditions

  6. Watermain Improvements

  7. Sanitary Sewer Improvements

  8. Storm Sewer Improvements

  9. Retaining Wall Improvements

  10. Sidewalk Improvements

  11. Potential Sidewalk Improvements • Best Location South and East of Grandview • May Require Purchase of Easements for Utility Relocation, Including Fire Hydrants • Five-Foot Wide Sidewalk Adjacent to Back of Curb • Some Tree Removal and Retaining Wall • ADA Pedestrian Curb Ramps and Cross-Walk to Grandview Middle School

  12. Estimated Project Improvement CostsWithout and With Sidewalk Without $ 939,000 542,900 125,800 80,400 9,300 $1,697,400 With $ 940,600 542,900 125,800 80,400 21,600 95,500 $1,806,800 • Street • Watermain • Sanitary Sewer • Storm Sewer • Retaining Wall • Sidewalk (5-Foot) TOTAL: ͞

  13. Grandview Boulevard FinancingWithout and With Sidewalk Without $ 939,000 - 45,000 - 448,400 $ 445,600 - 148,530 $ 297,070 With $ 940,600 95,500 - 45,000 - 448,400 $ 542,700 - 180,900 $ 361,800 Estimated Total Street Cost Estimated Sidewalk Cost Extra Section Cost (Paid by City) Deduct Street Cost Due to Utility Replacement Assessable Street Cost Amount Paid by the City (1/3) Amount Assessed to Benefitting Properties (2/3) ͞

  14. Assessment Area

  15. Grandview Boulevard Estimated AssessmentWithout and With Sidewalk Without $ 297,070 $ 28,480 $ 268,590 58.11 $ 4,622 With $ 361,800 $ 34,700 $ 327,100 58.11 $ 5,629 Typical Assessment: Amount Assessed to Benefitting Properties Amount Assessed to Commercial Properties 1 Amount Assessed to Residential 2 Total Benefitting Equivalent Residential Units Estimated Per Unit Assessment = $268,590/58.11 = • Combination Method for Assessments (Based on Front Footage: 30%, Area: 30%, # of Units: 40%) • Unit Method for Assessments (Based on Residential Parcel); Single Family Units = 42 Full ERUs, 13 One-Half (6.5 ERUs), 1 One-Third (0.33 ERUs); High Density Residential = 8 Units x 0.75 = 6 x 0.5 = 3 Area Method for Grandview Apartments to Determine # of ERUs (125,550 sq. ft.. ÷10,000 sq. ft. per lot = 12.56 x 0.5 = 6.28 ERUs)