An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Neighborhood Meeting South Lamar Complete Street Improvements From I-45 to Hatcher January 30, 2014 St. Paul Baptist Church

  2. Neighborhood Meeting - Jan 30, 2014 South Lamar Complete Street ImprovementsAgenda • Welcome and Opening Remarks Honorable Councilmember Carolyn R. Davis Council District 7 • Project Overview Alva Baker, Baker Consulting • S. Lamar Street Project Presentation Tricia Hatley, P.E., Freese and Nichols Inc. • Questions and Comments • Meeting Adjourned 6:00 PM 7:00 PM

  3. Purpose of Meeting • Share project overview and receive citizen input • Discuss specific project components • Communicate schedule and next steps • Questions and Answers

  4. Introductions City of Dallas • Honorable Councilmember Carolyn R. Davis, Council District 7 • Jill Jordan, P.E., Asst. City Manager • Rick Galceran, P.E., Public Works Director • Tim Starr, P.E., Asst. PW Director • Keith Manoy, Transportation Planning/Asst. PW Dir. • Raj Guntnur, P.E., Project Manager • David Whitley, City Design Studio Director • Tanya Brooks, Chief Transportation Planner

  5. Introductions Freese and Nichols – Design Consultant • Project Manager, Tricia Hatley, P.E. • Design Engineer, Tim Sansone, P.E. • Stormwater Engineer, Thomas Caffarel, P.E. • Project Planner, Cody Richardson, RLA • Public Involvement, Alva Baker (Baker Consulting)

  6. Background • Project approved in 2012 Bond Program • Drainage concerns • Deteriorated pavement • Lack of pedestrian amenities • Engineering/design contract approved by City Council in June 2013

  7. Previous Neighborhood Meeting • LINCing Dallas – June 2, 2012 led by City Design Studio • Resulting Objectives and Design Program • Lamar was identified as a grand boulevard • Pedestrian amenities and lighting were identified as a key implementation step • Enhance existing parks and create new open spaces sprinkled throughout • Create a collaboration between local businesses and neighborhood associations to visually enhance the area • Engage artists and develop public art

  8. Project Location St. Paul Baptist Church Emery St Hatcher St Pear St Bannock Ave Stoneman St Marburg St South Lamar St I-45

  9. Project Goals • Reconstruct deteriorated pavement from I-45 to Hatcher • Improve drainage main lines with South Lamar • Upgrade water and wastewater • Incorporate pedestrian amenities • Benches, trees and crosswalks

  10. Project Goals • Improve traffic flow for current and future growth • Create a sustainable roadway • Coordinate with TxDOT project on roadway transition and drainage improvements

  11. Proposed Improvements Roadway • 4 lanes, undivided with turn lanes (48’ wide typ) • New concrete roadway (approx. 2600LF) w/curb and gutter • Decorative crosswalks at Pine and Hatcher Pine St Marburg St Stoneman St Pear St Bannock Ave Hatcher St S Lamar St

  12. Proposed Improvements • Large green space w/wider sidewalks on residential side • Shared bicycle lanes on both sides *Cross section is conceptual and may change during the design process

  13. Streetscape Concepts • Linear sculpture garden • Wide parkway on residential side • Wider sidewalk/trail • Bioretention for drainage and water quality • Enhanced landscaping • Trinity standard street and pedestrian lights • Benches • Trees

  14. Proposed Improvements Streetscape (view looking southeast)

  15. Linear Sculpture Garden • Sculpture by local artists • Rotational program • Support from local businesses 1 1 1 1 1

  16. Bus Stops and Seating Bus stop with shelter 2 2 2 Bus stop without shelter Bench Seating 2 2

  17. Street Lighting • Consistent with Dallas Trinity River Project standards • Street lights • Pedestrian lights 3 3 3 3 3 3 3 3 3 3 3 3

  18. Bioretention • Captures storm water runoff • Creates enhanced landscape area • Provides water quality benefits

  19. Bioretention 4 4 4 4 4 4 4

  20. Storm Drainage Improvements Existing conditions • Storm drain main lines undersized • Too few inlets Proposed Improvements • Additional inlets on neighborhood streets • Upsized main lines • Improved storm water outfalls

  21. Storm Drainage Improvements Additional curb inlets Hatcher St Main line and channel improvements Main line and channel improvements

  22. Water/Wastewater • Various water main replacements • Wastewater collection line replacement Pear St Emery St Hatcher St

  23. Existing South Lamar

  24. Proposed Improvements

  25. Project Cost • 2012 Bond Funds - $4,898,000 • Design/Engineering/ Surveying Contract - $739,214 • Amount available for Construction funding - $4,158,786

  26. Project Schedule • Traffic Study – December 2013 • Survey - January 2014 • Drainage Study – January 2014 Neighborhood Meeting #2 – May 2014 • Conceptual – April 2014 • Preliminary – September 2014 • Final – December 2014 • January to March- 2015 • April 2015 to June 2016

  27. Questions Raj Guntnur, P.E. Project Manager, City of Dallas Rajasekhar.guntnur@dallascityhall.com 214-948-4011 Alva Baker Public Involvement, Baker Consulting Bcaabaker@aol.com 214-404-4464