An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aviation Logistic Support ShipT-AVB&BOH CONTAINER Eval21 -25 Apr 2008

  2. DISCLAIMER This presentation is neither an endorsement or denouncement of the BOH products. It is simply a summary report on BOH v. TAVB compatibility testing and issues that would need to be addressed should BOH products be considered for deployment on a TAVB.

  3. PURPOSE • Marine Aviation Logistics (AVLOG) transition to MALSP II • Reshaping logistical elements • Enable highly effective, agile, and flexible combat support • Marine Aviation Logistics Modernization • Enabler and force multiplier • Commonality = Flexibility • Integration of emerging concepts • Re-packaged supply containers • Ground/Air capability enhancements

  4. T-AVB MISSION STATEMENT • Provide Primary Strategic and Dedicated Sealift for the Movement and Operation within a theater of operations for a Marine Aviation Logistics Squadron (MALS) to support the rapid deployment of Marine Corps Fixed Wing (FW) and Rotary Wing (RW) aircraft units • Provide aviation intermediate maintenance repair capability that supports Aviation Combat Element (ACE) of a Marine Air Ground Task Force (MAGTF) or Security Cooperation (SC) MAGTF Source: T-AVB Yellow Book

  5. MISSION (cont) • Provide host MALS Support via FW or RW Facility Equipment (FE) contained in Mobile Facilities (MF) • To Provide Aviation Re-Supply via: • Load On/Load Off (LO/LO) • Roll-On/Roll-Off (RO/RO) • MARLOG • In-Stream Offload

  6. OPERATIONAL ASSESSMENT OF BOH CONTAINERS • T-AVB operational assessment of the BOH containers • Existing shortfalls for T-AVB operations • Space constraints • Container limitations onboard the T-AVB • Ship Modifications required for existing containers • Potential mitigation plan to provide a viable solution • BOH redesign options • Possible MF / EPU module migration • Maintenance requirements for containers • CSC requirement • Corrosion Control issues • 990 issues...i.e.... Environmental/electrical/MHE • Fleet discussion of options • T-AVB Capabilities • Phase ashore • What is the requirement????????

  7. Existing Shortfalls • Space limitations • Operational Mode • 300 Mobile Facilities • 186 Electrically connected • What space would be given up to support ????

  8. Existing Shortfalls (cont) • Constraints • Containers are side opening modules not end opening • Current BOH configuration will require major ship modifications • Relocation of major supporting super structures.

  9. Existing Shortfalls (cont) • Container being lowered in to Hold 3 access area • Modifications to the existing Access modules will be required for use

  10. Possible Solution • Potential mitigation plan to provide viable solution • BOH container redesign • Existing containers do not fit the T-AVB mission in an Operational mode • BOH containers need to fit the end opening style. But still allow for each individual Expeditionary Pack-up Units (EPU) to be easily installed and removed • BOH containers redesigned on Access Module style container allowing users to enter from the end and ease of installation and removal of individual EPU

  11. Possible Solution (cont) • Possible MF and EPU migration • Current EPU units • 34 1/2” x 42” x 74” (L x W x H) • Only permit 50% of the internal space of a MF to utilized • Allows for only (6) EPU along one side only • Build EPU units that are 34 ½” x 32” x 74” • Allows drawers to be fully extended • Allows for (6) units along one side and (4) additional units on the opposite side • Build an embedded track or rail system into the floor with an EPU locking system. Allows for easy maneuvering of fully loaded EPU units. SU-12 with Ten Smaller EPUUnits on an Embedded Rail

  12. Possible Solutions (cont) • Mobile Facilities provide • Lighting • Controlled environmental conditions • Work Space • Current Mobile Facilities can be easily reconfigured to accept modules • SOMF-C allows placement of modules and retains end access capability.

  13. Maintenance • Observed maintenance requirements • Corrosion Control • Scheduled and unscheduled • Patch repair • Gusset repair • CSC inspection • BOH containers with the exception of electrical will have the same maintenance as a MF • MF’s are a DoD program of record, what will be the funding source for BOH maintenance, parts and life cycle costs?

  14. HULL LIFE /POM CYCLE • SS Wright (T-AVB 3) 1970 / SS Curtiss (T-AVB 4) 1969 • 50 year Hull Life • Usable life expires 2019 and 2020 respectively • Hull life not extendable • T-AVB relevance in MALSP II • Program Objective Memorandum (POM) decision by 2012 to influence 2016 funds • Later decision will surpass existing hull life

  15. MPF(F) Compatibility • With the TAVBs nearing their end of life, are there issues related to embarking BOH units with the TAVB-like capability being planned for MPF(F) ships? • Space constraints • Accessibility • Footprint • Macro cargo movement (containers) restrictions

  16. What is the Requirement ??? • Midrange Threat Estimate” the Marine Corps can expect to conduct operation along the Littoral Regions • Expeditionary Maneuver Warfare (EMW) • Emphasizes strategically agile and tactically flexible MAGTF • Operational Maneuvers From the Sea (OMFTS) • Ship-to-Objective Maneuver (STOM) • Other Expeditionary Operations (OEO) • Distributed Operations (DO) • Sea-basing • Sea-basing scalable aggregation of distributed and networked platforms that provides for: • Assembly Equipping Support Sustainment • T-AVB capabilities • Sea-based and Pier-side repair • Movement of MF repair and supply storage facilities • Future global environments • Ubiquitous and ambiguous threats • Denial to geo-cultural centers of gravity • Marines’ ability to respond to ever increasing and unpredictable tasking