An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Airports departmentVPS Tenant managers meeting – aug 2017

  2. Meeting agenda • Welcome/Introductions • Employee Awards • Airport Projects Update • Policy and Procedures Update • OCSO Updates • TSA Updates • Questions/Comments/Suggestions

  3. Destin-Fort Walton Beach Airport Employee of the Quarter

  4. Carpet Replacement Project • $319K project to replace over 50,000 SF of carpet throughout the public spaces of the terminal • Custom design evoking the Emerald Coast and 100% recycled product • 45-day contract beginning evening of 23 August with typical work times of 7pm to 3am

  5. TWYs D1/D2 Rehab & West Apron Blast Fence • $2.3M project (~180 days) to resurface taxiways from Eglin runways to VPS AOA • Phased closure of Twy D1 (100 days) and Twy D2 (50 days) • Includes signage work, seal shoulders, taxiway lights regulator, and new blast fence on the west apron • Bid opening 23 August; construction estimated to start in November; haul routes and impact to public/tenants

  6. Security Bollards • Project to enhance security at the front curb and sides of terminal • Includes removable bollard on the AOA for tug passages under the concourse • Bid documents completed and will go to Purchasing for advertisement in early September • Construction estimated to begin in November; phased impact of slab removal at front entrances

  7. Storm Water Pollution Prevention Plan (SWPPP) & Other Notable Project Highlights • SWPPP • Multi-Sector General Storm Water Permit (MSGP) re-applied for entire site • Must update SWPPP document as a requirement of the permit every 4 years; purpose is to manage storm water runoff and protect receiving surface and ground water sources from pollutants • Most tenants are considered co-permitees and therefore questionnaire response is critical to entire team • DRAFT SWPPP from Hanson Engineering; Key highlights are improved annual inspections and training to include SPCC • Other Project Notes • Fuel Farm Expansion – increased commercial traffic compounded on top of Twy D1/D2 project • Hwy 85 Exit Sign & BHS Recapitalization Projects Complete

  8. POLICY AND PROCEDURES UPDATE • Badge Audit and Process • FY2017 Audit Report • Upcoming changes to Badge Procedures (location) • Airport Re-Key Effort • New Key form and issuing process • On-Airport Parking • All Airport employees will be required to display a VPS parking decal on their vehicle regardless of parking lot used • Fuel Operations • Policy will be issued that changes the current process for key and PIN issue

  9. Okaloosa county sheriff’s officeAirport Security Unit

  10. TSA Current Events • Enhanced Accessible Property Screening (EAPS) • EAPS Training will begin in late September. Implementation to be announced. Main focus is to simplify the screening of the “carry on bag” process. • Note: This process will require MORE electronic items to be divested. • Media tour of TSA Technology and Layers of Security. Friday August 25, 2017 • 9/11 Commemoration 7:45 Monday September 11, 2017 • The TSA Security operations were very successful thanks to everyone’s support and cooperation during the peak traveling season. On behalf of the entire TSA team, thanks for a successful summer!

  11. Questions / Comments / Concerns ?