An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MV90 Upgrade to Version “XI” Pat Vinton MDAS System Lead Meter Working Group Meeting May 11, 2006

  2. Timeline Summary • Software Evaluation Period: 2005 • Test Period: • Dec 13 – 16, 2005: Loaded on Test System • Dec 28, 2005 - Jan 20, 2006: Ran Test System in parallel and compared data to Production MV-90 • Loaded “XI” on Production MV90: • Jan 25 - 27, 2006 • TDSPs curtailed field activities for only urgent work – THANKS….THANKS….THANKS!!! • Move to “XI” as Production MV90: • Jan 28, 2006

  3. Event Logging Update See updated spreadsheet of MV90 vs. Mfg event codes

  4. DST Update – Meter Reprogramming Reprogramming of Meters for DST • Most TDSPs are electing to remove DST from the meters • Some TDSPs have elected to load revised DST schedule into the meter and leave on DST • ISSUE: Removing DST Flag • If in DST, the time in the meter MUST be corrected to “standard” time (1 hour BEHIND clock time) • If not in DST, do NOT adjust meter time when removing DST flag