60 likes | 150 Vues
April 1, 2013. All Experimenters’ Meeting. Photo by Joe Pathiyil. Shutdown 2012. Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning and studies
E N D
April 1, 2013 All Experimenters’ Meeting Photo by Joe Pathiyil
Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning and studies TeV & Muon Rings – Partially available for tours with approval and appropriate training
Power Outages - Unplanned • Feeder 46B • Tuesday, January 29th • Isolated fault (Between F4 & P71) • Repairs underway • New cable pulled in • Splicing cables in manholes this week • A1, A2, & A3 power outages this week Monday through Friday from 0800-1630.
MSS Bypass Project – Completed List • Booster • High Intensity Lab (HIL) • Neutrino Service Building 7 (NS7) • Proton Service Building 1 (PS1) • Neutrino Service Building 1 (NS1) • Meson Service Building 2 (MS2) • Meson Service Building 1 (MS1)
MSS Bypass Project – What’s next • Work in front of Master SubStation • New pad with 6 colorful switches • Expanding existing manholes in area • Will need to power down some feeders during excavation over existing duct banks • CHL, Industrial Building and CDF will get power outages • We are several weeks away and need start making plans
Shutdown 2012 Schedules and Links: Schedule can be accessed from the Operations Home Page - Schedules -> Operations Schedule Direct link to schedule - http://www-ad.fnal.gov/ops/schedule.html ANU - http://www-cons/ Proton Source -http://www-ad.fnal.gov/proton/protonsched/shutdown2012.html