SlideServe
Menu
Préférences
© SlideServe · v2026

Crabs cavities @ IP4?

ohanzee-ojeda avatar
8 diapositives · 232 Views · Nov 18, 2014

Crabs cavities @ IP4?. Objectives of the “investigation”. Is there any possibility to install one crab cavity module (assuming same size as one LHC ACS cavity) on each side of IP4? Where? Is it possible to connect the crabs to the cryogenic system?

Crabs cavities @ IP4? - slide 1
01 / 8Crabs cavities @ IP4?
1 / 17

Télécharger la présentation

Crabs cavities @ IP4?
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Crabs cavities @ IP4?

  2. Objectives of the “investigation” • Is there any possibility to install one crab cavity module (assuming same size as one LHC ACS cavity) on each side of IP4? Where? • Is it possible to connect the crabs to the cryogenic system? • Where to install crab power stations and power lines?

  3. Where Crabs could be installed? • Not possible to free space in the ACN cavities region (power lines, RF couplers, access behind the ACN) • The spare damper position is the place where the crabs could be fitted in the vicinity of IP4 (see drawing) • In case the spare dampers need to be installed (only LHC operation will tell us), there will be no possibility to install crab cavities at IP4.

  4. How to feed the crabs with LHe? • It is not possible to connect to the existing ACS line (feeding the ACS cavities) • Therefore, integration and installation of a dedicated jumper must be studied • Requires detailed study • Jumpers diameter might be bigger than QRL diameter ? (see ACS jumper on drawing)  does it affects the crab cryostat? • Jumpers installation is very complicated (de-installation of beam lines equipment, cutting off of the QRL) • Expensive (>0.5MCHF)

  5. How to power the crabs? • Restricted space available in the Uls (where the ACN power stations will be installed) • How many square meters are required for crab power stations? • Need detailed integration of the power lines, water cooling distribution, etc required (very busy area)

  6. General view (IP4 left) ACN power ACN power

  7. IP4 ARC 34 ACS jumper ACS cavities APWs SPARE ADT ADT ACN ACN power Crab power?

  8. Conclusion • The spare damper region is the only possible place susceptible to host the crab cavities at IP4. In case these additional dampers are need for future operation, installation of the crabs will not be possible (in IP4). • Connecting the crabs from the QRL looks possible (there is no other solution). More detailed study is required. • The crab power stations could be installed next to the ACN power stations in the Uls. Detailed integration needed.