Discover an exceptional investment opportunity in Hodovo, Bosnia and Herzegovina, featuring a top-tier solar power plant with a capacity of 900 kW. Positioned in a region with optimal climatic conditions, this project benefits from excellent infrastructure, including proximity to Corridor Vc. With 100% private ownership, necessary zoning and building approvals are in place. The project promises strong profitability with an expected annual income of €420,000, an IRR of 8%, and a payback period of just 8 years. Join us in harnessing renewable energy!
E N D
TURN TO THE SUN INVEST IN SOLAR POWER PLANTS HODOVO ECO ENERGY d.o.o. ANAREA d.o.o.
Distances between major regional centers Location: Bosnia and HerzegovinaStolac-Hodovo Stolac Mostar 30 Km Sarajevo 130 Km Stolac Dubrovnik 80 Km Stolac
Basic information: • 100 % private ownership • Total power plant of 900 kW • The most favorable climatic conditions in Bosnia and Herzegovina • High-quality road infrastructure and proximity to the future highway - Corridor Vc • Locations with the highest number of sunny days a year - statistically determined • Close to toll transmission line Koridor Vc Stolac The main equipment : • PV panels REC 240 PE • Inverter SMA SUNNY Tripower 15000 TL • Radox solar cables • Monitoring system SMA portal • Atmosheric discharge protection system Hermi
Status of the project • Is registered land ownership • Inscribed in the book of OIEK (renewable energy sources and efficient cogeneration) projects in construction at the Federal Ministry of Energy • The necessary zoning and building approval • Made preliminary and final project • Made a study on the impact of the reflection on the surrounding buildings and roads Data on solar radiation Based on reports from PVGIS European Communities, 2001-2010 year, the most important data on solar radiation at coordinates 430 and 170 4I 57I 53II 13II east longitude and 69 meters above sea level are: • Summary global radiation is hm = 1740 kWh/m2 and • Chance of electricity production Em = 1330 kWh / kWp
Capital investments and returns: The amount of investment € 1,700,000 The first phase of € 380,000 Profitability of investment after 8 years Expected annual income of € 420,000 Net present value NPV: € 30,396 Internal rate of return IRR 8% Sales strategy: Contractedsales of electric powertorelevant electricity company Contracted sales conditions and framework principles defined by regulation of the Federation of Bosnia and Herzegovina and for a period of 12 years guaranteed price and the framework for investment return
Project financing • Own investment 30% • Strategic partner: 50% • Additional private investment: 20% • Contacts: • Eco energy d.o.o., • Gracanica, Bosnia and Herzegovina • E-mail: d.salibasic@ecoenergy.ba • Tel: 00387 35 707 800 • www.ecoenergy.ba • Anarea d.o.o., • Mostar, Bosnia and Herzegovina • E-mail: tihomir.rozic@tel.net.ba • Tel: 00387 63 311 959