1 / 9

Objective ATC 02.5

Objective ATC 02.5. ESSIP Plan 2014. Ingrid FEIJT DSS/PEPR 19.09.2014. Comprehensive Explanation (1/2). Implementation of Area Proximity Warning (APW) function ECAC applicability

onofre
Télécharger la présentation

Objective ATC 02.5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective ATC 02.5 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

  2. Comprehensive Explanation (1/2) • Implementation of Area Proximity Warning (APW) function • ECAC applicability • Requires implementation by all ATC units providing radar services to GAT traffic within En-route airspace, TMAs and CTRs. • Military authorities: Military ATC authorities are invited to consider implementation of APW level 2 when providing ATS surveillance services to GAT ESSIP Plan 2014 / Objective ATC 02.5

  3. Comprehensive Explanation (2/2) • APW checks the extrapolated track positions (based on radar data = current track position and linear extrapolation using ground speed) and identifies the predicted or actual conflicts against the protected airspace. • Protected areas might be restricted, danger or prohibited zone or Temporary Segregated Areas (TSA) or Temporarily Restricted Areas (TRA). • Conflict is declared if a/c track infringes the protected airspace or intends to do so in short distance in time (</= 2 minutes). • Some FP data like Cleared Flight Level (CFL) might be used in case of temporarily absence of Mode – C. • APW requires an appropriate presentation of predicted / actual conflicts to the tactical controllers and ATC supervisor. ESSIP Plan 2014 / Objective ATC 02.5

  4. Link to European ATM Master Plan • [CM-0801] – Ground Based Safety Nets (TMA, En Route) ESSIP Plan 2014 / Objective ATC 02.5

  5. Most important SLoA(s) • ASP01 “Implement the APW function to put into service ground-based safety tool systems and associated procedures supporting the APW function in En-Route airspace, applicable TMAs and Military ATC units providing surveillance services.” • ASP to check the compliance of implemented APW with the requirements stated in the Specification, the related guidance material and the relevant training and safety requirements. ESSIP Plan 2014 / Objective ATC 02.5

  6. Finalisation Criteria • Ensure that Ground systems have been upgraded to support the APW function. • Ensure that the technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA). • Ensure that the APW function is in operational use. • Ensure that the training plans have been updated and a training package has been developed by the ANSP for the use of APW functions. ESSIP Plan 2014 / Objective ATC 02.5

  7. Supporting Material • The EUROCONTROL specification for APW has been issued in May 2009 (edition 0.5) which still a draft, as well as the related guidance material. This if for guidance only, and is not compulsory. • EUROCONTROL Guide ‘Safety Nets Ensuring Effectiveness’, dated 21 May 2011 • Council Decision of 30 March 2009 endorsing the European ATM Master Plan of the Single European Sky ATM Research (SESAR) project (2009/320/EC) ESSIP Plan 2014 / Objective ATC 02.5

  8. ESSIP Report 2013 • Progress has been made in deploying this objective since the previous report (2012). 19 States have declared this objective as completed. • The majority of the remaining States have actions planned to be completed by December 2016 end of the full operational capability date. 7 States between 04/2014 and 12/2014 and 1 State by 06/2015. Two States indicated not being able to do this by 12/2017. ESSIP Plan 2014 / Objective ATC 02.5

  9. Contacts • Objective Coordinator: FEIJT, Ingrid +32 2 729 5044 ingrid.feijt@eurocontrol.int • DNM Objective Expert(s): BAKKER, Ben +32 2 729 3149 ben.bakker@eurocontrol.int DROZDOWSKI, Stanislaw +32 2 729 3760 Stanislaw.DROZDOWSKI@eurocontrol.int ESSIP Plan 2014 / Objective ATC 02.5

More Related