We@Sea large-scale wind power generation offshore. R&D programme 2004 – 2008 Jos Beurskens. EWEC 2006, Athens February 28, 2006. Offshore wind energy programme We@Sea. Initiated by major stake holders We@Sea is a consortium of 32 members

orsen
Télécharger la présentation

We@Sea large-scale wind power generation offshore

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. We@Sealarge-scale wind power generation offshore R&D programme 2004 – 2008 Jos Beurskens EWEC 2006, Athens February 28, 2006

  2. Offshore wind energy programmeWe@Sea • Initiated by major stake holders • We@Sea is a consortium of 32 members • Co-financed by the Dutch government € 13 million (45%)

  3. the We@Sea consortium • R&D Establishments • ECN windenergie, • TNO • TU-Delft • WMC BV • environment, nature • & safety • Bureau Waardenburg / • Alterra-Texel / NIOZ • Greenpeace • RIVO • St.Noordzee • University Twente • wind turbine manufacturers • GE wind energy • Vestas NL, (NEG Micon) • offshore technology • Ballast Nedam • Fabricom • Fugro Engineers BV • Genius Vos • IHC GustoMSC • Lloyd’s Register NL • Smart Tower • project developpers • E-connection, • E-concern (Evelop) • Shell Wind Energy BV • wind energy technology • ·Multiwind BV • ·Rheden Steel • ·Siemens • energy consultants: • Kema Power • Ecofys • energy sector • Delta Nuts BV • ENECO • Nuon • Statkraft • TenneT • logistics and harbour development • Dynamar • financers • NIB Capital Bank

  4. The aim of the programme To gain knowledge needed for implementation of 6000 MW wind energy at the North Sea. (= 15% of present electricity demand in NL)

  5. 100 MW NSW120 MW Q7 01-2006: 1300 MW National WE targets Wind contributes 16% to RE target 2020 9000 MW 7500 MW (= 45 PJ) National Policy: 2010: > 1500 MW on land + 2020: 6000 MW offshore 6000 MW 3000 MW offshore 1500 MW on land 1990 2000 2010 2020 2030 Note: The energy-unit [PJ] indicates fossil fuels being replaced.

  6. Netherlands in perspective 1990 1995 2005 2000 At present: 1978 – 1985 R&D 23.3 MW S DK NL GB EIR D USA B 417.4 MW 18.8 MW 304 MW 25 MW 7 MW Total world: 802 MW

  7. Targets • Reduce generation cost of offshore wind energy: installation, operation costs • Increase value of offshore wind electricity • Planning regulations, which favor wind energy. • Outline for grid modifications

  8. Developer hasbest overview = We@Sea subject Ref.: Klaus Rave and others

  9. We@Sea research areas • integration & scenarios • offshore wind power generation • spatial planning & environment • energy transport & distribution • energy market & financing • installation, exploitation, maintenance & decommissioning • training, education & dissemination of knowledge

  10. We@Sea Σ = 26 million € • 0. integration & scenario’s 1,3 • offshore wind power generation 5,7 • spatial planning & environment 7,2 • energy transport & distribution 4,1 • energy market en financing 1,2 • installation, operation, maintenance & dismantling 4,3 • training, education, & dissemination of knowledge 0,7 • programme management 1,6

  11. Development of environmental effects monitoring equipment Grid (inter)connection ofoffshore wind farms(E-Connection) Only economically feasible if combined with other purpose interconnectors Bird collision detection ECN Birds flight detection radar TNO Cumulative effects (TNO) O & M Cost Estimator (ECN) Maintenance logs of 5 N80’s (FMECA format) serve as update of corrective maintenance frequency • Vision angle from Hook of Holland • Permanent loss of sea bottom habitat • Gain of hard substrate habitat PhD@Sea: 9 PhD’s at TU Delft addressing various priorities 5 selected projects from total of 25

  12. Lessons • Bottom-up initiative is essential • Programmes are used by authorities for regional economic development, which might jeopardise inter-regional/national collaboration. • Co-financing level too low (< 50%) • Demand based projects sometimes conflict with highest scientific requirements