1 / 10

Subcommittee 3

Subcommittee 3. Where could the EMS lie? What are the options? 9 options. What are the critical Stakeholders that BEMS interfaces with on a daily basis? On a disaster basis? 6 critical stakeholders that directly affect BEMS operations.

oya
Télécharger la présentation

Subcommittee 3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Subcommittee 3 Where could the EMS lie? What are the options? 9 options. What are the critical Stakeholders that BEMS interfaces with on a daily basis? On a disaster basis? 6 critical stakeholders that directly affect BEMS operations. What are the grants/funding streams that may be affected by re-locating BEMS? 5 funding streams What is the Current, Intermediate, and Future Structure of BEMS? Current and Future models are provided for discussion.

  2. 1. Where could the BEMS lie? There are 9 possible options. Pros and Cons were identified by a small group. The larger group can make additional pros and cons as needed/discussed.

  3. 2. How does BEMS Interface with Critical Stakeholders? During a Disaster… On a Daily Basis… 6 critical stakeholders were identified as interfacing with BEMS. Upon discussion, it was clarified that the interface was a different times – daily basis versus during a disaster situation.

  4. 3. What Grants/Funding Streams would be affected by re-locating BEMS? • BEMS is a recipient of the following federal funds: • HRSA: Trauma/Stroke Program • HRSA: AED Grant • HRSA: EMS for Children • BEMS is a sub recipient of grant funds as they are embedded with OPH: • Preventative Block Grant • BEMS is a sub recipient of grant funds as they are embedded with DHH: • Hospital Preparedness Program Grant Funds Unintended Affect: BEMS may risk losing grant funds for Preventative Block Grant and HPP Grant if not embedded within OPH or DHH

  5. 4. What is the Current, Intermediate, and Future Structure of BEMS?

  6. Future Structure – Based on National Model Source: National Association of State EMS Officials; State EMS Systems Models Project June 2010

  7. Current Structure

  8. Current Structure – “distilled” version

  9. Intermediate Structure • To Be determined?

  10. Organized by: • Evon Smith • Rosanne Prats Subcommittee 3 has met once; 3 people on the call - (Chair R. Daughdril; E. Smith; R. Prats). The document is purposely not completed so that the additional members of Subcommittee 3 and the Full Group can provide input and/or direct different pathway.

More Related