Project in Review. Project Objectives Challenges: Design Phase Challenges: Construction Phase Questions. Freescale Semiconductor Chandler Groundwater Pipeline. Objectives. Groundwater Source and Water Quality Desired Flow Rate and Required Pipe Size Project Cost

paco
Télécharger la présentation

Project in Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project in Review • Project Objectives • Challenges: Design Phase • Challenges: Construction Phase • Questions Freescale Semiconductor Chandler Groundwater Pipeline

  2. Objectives • Groundwater Source and Water Quality • Desired Flow Rate and Required Pipe Size • Project Cost • Project Complete Before Funding Deadline • Other Freescale Semiconductor Chandler Groundwater Pipeline

  3. Design Challenges • City’s Acceptance of Final Design Concept • Establishing & Satisfing City &County requirements for industrial use • Tie-ins and interface with City (pump station wells & distribution lines) • Running alignment in congested utility corridors Freescale Semiconductor Chandler Groundwater Pipeline

  4. Design Challenges “An air gap or a reduced pressure principle backflow prevention assembly is recommended at each service connection when the auxiliary water supply is or may be contaminated to a degree that would constitute a health hazard;” • City’s Acceptance of Final Design Concept • Establishing & Satisfing City &County requirements for industrial use • Tie-ins and interface with City (pump station wells & distribution lines) • Running alignment in congested utility corridors Freescale Semiconductor Chandler Groundwater Pipeline

  5. Design Challenges Evergreen/Apache Well Site • City’s Acceptance of Final Design Concept • Establishing & Satisfing City &County requirements for industrial use • Tie-ins and interface with City (pump station wells & distribution lines) • Running alignment in congested utility corridors Orchid Lane Well Site Freescale Semiconductor Chandler Groundwater Pipeline

  6. Design Challenges • City’s Acceptance of Final Design Concept • Establishing & Satisfing City &County requirements for industrial use • Tie-ins and interface with City (pump station wells & distribution lines) • Running alignment in congested utility corridors Proposed Alignment/Utilities Installation of Pole Bracing Bluestaked Utilities Completed Pole Bracing Freescale Semiconductor Chandler Groundwater Pipeline

  7. Construction Challenges Blue Staked Utilities • Utilities • Locations Differ • Sizes Differ • Abandoned or Live • Tie-ins • Pipe materials differs from City as-builts • Location of desired tap line differs from City as-builts Abandoned Telco. Line Live ACP Water Line Freescale Semiconductor Chandler Groundwater Pipeline

  8. Construction Challenges • Utilities • Locations Differ • Sizes Differ • Abandoned or Live • Tie-ins • Pipe materials differs from City as-builts • Location of desired tap line differs from City as-builts D.I.P. to A.C.P. Connection Freescale Semiconductor Chandler Groundwater Pipeline

  9. Construction Challenges • City Shutdowns • Old inoperable valves • Familiarity with distribution system for isolation • Acceptance Testing on Industrial Line • Initial disinfectant injection point was downstream of City well feed • Construction production with City work hour restrictions in traffic Valves, South of Orchid Lane Well Freescale Semiconductor Chandler Groundwater Pipeline

  10. Construction Challenges • City Shutdowns • Old inoperable valves • Familiarity with distribution system for isolation • Acceptance Testing on Industrial Line • Initial disinfectant injection point was downstream of City well feed • Construction production with City work hour restrictions in traffic Chlorine Injection, Evergreen/Apache Well Site Freescale Semiconductor Chandler Groundwater Pipeline

  11. Construction Challenges • City Shutdowns • Old inoperable valves • Familiarity with distribution system for isolation • Acceptance Testing on Industrial Line • Initial disinfectant injection point was downstream of City well feed • Construction production with City work hour restrictions in traffic Intersection of Alma School Rd. & Knox Rd. Freescale Semiconductor Chandler Groundwater Pipeline

  12. Project in Review • Project Objectives • Challenges Design Phase • Challenges Construction Phase • Contracting & Agreements • Questions Project Completed Under Budget & On Schedule Freescale Semiconductor Chandler Groundwater Pipeline